Army Awards $20.5M for Philpott Landslide Mitigation to David Boland Inc
Contract Overview
Contract Amount: $20,477,956 ($20.5M)
Contractor: David Boland Inc
Awarding Agency: Department of Defense
Start Date: 2023-10-13
End Date: 2026-04-26
Contract Duration: 926 days
Daily Burn Rate: $22.1K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 6
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: PHILPOTT LANDSLIDE MITIGATION
Place of Performance
Location: BASSETT, HENRY County, VIRGINIA, 24055
State: Virginia Government Spending
Plain-Language Summary
Department of Defense obligated $20.5 million to DAVID BOLAND INC for work described as: PHILPOTT LANDSLIDE MITIGATION Key points: 1. Significant investment in critical infrastructure protection. 2. David Boland Inc. secured the contract. 3. Potential risks include project delays and cost overruns. 4. Construction sector spending benchmarked against similar projects.
Value Assessment
Rating: good
The contract value of $20.5 million appears reasonable for a project of this nature, considering the scope of landslide mitigation. Benchmarking against similar heavy civil engineering construction projects would provide a more definitive assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, suggesting a robust price discovery process. This method typically leads to more competitive pricing for the government.
Taxpayer Impact: The competitive award process is expected to ensure taxpayer funds are used efficiently for essential infrastructure work.
Public Impact
Protects vital infrastructure from natural hazards. Enhances public safety in the affected region. Supports local employment through construction activities.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for unforeseen geological challenges impacting cost and schedule.
- Reliance on a single contractor for a critical mitigation effort.
Positive Signals
- Awarded through full and open competition.
- Firm fixed price contract limits cost escalation risk.
- Project addresses a significant public safety concern.
Sector Analysis
This contract falls within the heavy and civil engineering construction sector, which is crucial for maintaining and upgrading national infrastructure. Spending in this area is often driven by public safety needs and federal infrastructure initiatives.
Small Business Impact
The data does not indicate specific participation or subcontracting by small businesses in this contract. Further analysis would be needed to determine the extent of small business involvement.
Oversight & Accountability
The Department of the Army's oversight will be critical to ensure the successful and timely completion of this mitigation project, adhering to all contractual and safety standards.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for unforeseen geological conditions.
- Complexity of large-scale civil engineering projects.
- Dependence on contractor's technical expertise.
- Environmental impact considerations during construction.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, va, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $20.5 million to DAVID BOLAND INC. PHILPOTT LANDSLIDE MITIGATION
Who is the contractor on this award?
The obligated recipient is DAVID BOLAND INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $20.5 million.
What is the period of performance?
Start: 2023-10-13. End: 2026-04-26.
What specific geological surveys and risk assessments were conducted prior to awarding this contract to ensure the mitigation strategy is adequate and cost-effective?
The contract award implies that sufficient preliminary assessments were completed to justify the scope and budget. However, detailed public information on the specific geological surveys and risk assessments is not provided in this data. Further inquiry with the contracting agency would be necessary to ascertain the depth and findings of these pre-award studies, which are crucial for validating the project's technical approach and cost-effectiveness.
What are the key performance indicators (KPIs) for this contract, and how will the Army measure the effectiveness of the landslide mitigation measures post-completion?
Key performance indicators for this contract likely revolve around the successful implementation of the mitigation plan, adherence to schedule, and budget. Post-completion effectiveness will probably be measured through ongoing monitoring of slope stability, reduction in erosion, and prevention of future land movement. Specific KPIs and monitoring protocols would be detailed in the contract's statement of work and performance requirements.
Given the firm fixed price nature, what provisions exist for change orders or unforeseen conditions that could significantly impact the project's final cost or timeline?
While a firm fixed price contract aims to cap costs, provisions for equitable adjustments or change orders typically exist for unforeseen conditions or scope changes directed by the government. The contract likely outlines specific procedures for submitting, reviewing, and approving such modifications. The contractor bears more risk for unforeseen issues, but significant discoveries could still lead to contract modifications if they meet defined criteria.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W912PM23B0024
Offers Received: 6
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: HZE
Contractor Details
Address: 219 INDIAN RIVER AVE STE 201, TITUSVILLE, FL, 32796
Business Categories: Category Business, Corporate Entity Not Tax Exempt, HUBZone Firm, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $20,477,956
Exercised Options: $20,477,956
Current Obligation: $20,477,956
Subaward Activity
Number of Subawards: 5
Total Subaward Amount: $12,674,842
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES
Cost or Pricing Data: NO
Timeline
Start Date: 2023-10-13
Current End Date: 2026-04-26
Potential End Date: 2026-04-26 00:00:00
Last Modified: 2025-12-10
More Contracts from David Boland Inc
- CAB Infrastructure - FY12 MCA PN 69489 Combat Aviation Brigade (CAB) Infrustructure, Phase 1, Wheeler Army Airfield, Oahu, HI — $68.0M (Department of Defense)
- Military - Construct the 4TH ID CAB Assault Battalion Maintenance Hangar, Fort Carson, CO — $55.4M (Department of Defense)
- Construct a 10MW Generation Plant, With Microgrid Controls — $54.3M (Department of Defense)
- Install Microgrid AT Fort Liberty, NC — $42.6M (Department of Defense)
- Design BID Build for Construction of Army Reserve Center, Vehicle Maintenance Shop, and Organizational (unheated) Storage Building in Asheville, NC — $32.1M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)