Army Reserve Center Construction Awarded to David Boland Inc. for $32.1M in Asheville, NC
Contract Overview
Contract Amount: $32,144,305 ($32.1M)
Contractor: David Boland Inc
Awarding Agency: Department of Defense
Start Date: 2024-06-20
End Date: 2026-08-31
Contract Duration: 802 days
Daily Burn Rate: $40.1K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 6
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: DESIGN BID BUILD FOR CONSTRUCTION OF ARMY RESERVE CENTER, VEHICLE MAINTENANCE SHOP, AND ORGANIZATIONAL (UNHEATED) STORAGE BUILDING IN ASHEVILLE, NC.
Place of Performance
Location: ASHEVILLE, BUNCOMBE County, NORTH CAROLINA, 28806
Plain-Language Summary
Department of Defense obligated $32.1 million to DAVID BOLAND INC for work described as: DESIGN BID BUILD FOR CONSTRUCTION OF ARMY RESERVE CENTER, VEHICLE MAINTENANCE SHOP, AND ORGANIZATIONAL (UNHEATED) STORAGE BUILDING IN ASHEVILLE, NC. Key points: 1. Project involves construction of Army Reserve Center, vehicle maintenance shop, and storage building. 2. Awarded via full and open competition, suggesting market availability of qualified contractors. 3. Firm fixed price contract type aims to control costs for the $32.1M project. 4. North Carolina location may influence local labor and material costs.
Value Assessment
Rating: good
The $32.1M contract price for this Design-Bid-Build project appears reasonable given the scope of constructing multiple specialized facilities. Benchmarking against similar military construction projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, indicating that multiple bidders were likely considered. This method generally promotes competitive pricing and ensures the government receives the best value.
Taxpayer Impact: The firm fixed price contract helps ensure taxpayer funds are used efficiently by establishing a ceiling on project costs.
Public Impact
Enhances Army Reserve readiness and operational capabilities in Asheville, NC. Supports local economy through construction jobs and material sourcing. Provides essential infrastructure for vehicle maintenance and storage.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen site conditions arise.
- Schedule delays due to weather or supply chain issues.
- Ensuring compliance with all environmental and building codes.
Positive Signals
- Firm fixed price contract limits cost escalation.
- Full and open competition likely secured competitive pricing.
- Experienced contractor (David Boland Inc.) potentially reduces execution risk.
Sector Analysis
This project falls within the Commercial and Institutional Building Construction sector. Spending benchmarks for similar military construction projects vary widely based on size, complexity, and location, but this award appears within a typical range for specialized facilities.
Small Business Impact
The data indicates this contract was awarded under full and open competition and does not specify any small business participation. Further analysis would be needed to determine if small business subcontracting goals were set or met.
Oversight & Accountability
The Department of the Army, through the Department of Defense, is responsible for oversight. The firm fixed price contract and the competitive award process provide a degree of accountability for cost and performance.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for scope creep if requirements are not clearly defined.
- Dependency on timely material and labor availability.
- Risk of schedule delays due to weather or unforeseen site issues.
- Ensuring long-term durability and maintenance cost-effectiveness of materials and construction methods.
Tags
commercial-and-institutional-building-co, department-of-defense, nc, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $32.1 million to DAVID BOLAND INC. DESIGN BID BUILD FOR CONSTRUCTION OF ARMY RESERVE CENTER, VEHICLE MAINTENANCE SHOP, AND ORGANIZATIONAL (UNHEATED) STORAGE BUILDING IN ASHEVILLE, NC.
Who is the contractor on this award?
The obligated recipient is DAVID BOLAND INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $32.1 million.
What is the period of performance?
Start: 2024-06-20. End: 2026-08-31.
What is the estimated cost per square foot for the facilities being constructed?
The provided data does not include square footage, making a precise cost per square foot calculation impossible. However, with a total contract value of $32.1 million over 802 days, the average daily burn rate is approximately $40,000. A detailed breakdown of facility sizes would be necessary for a meaningful cost per square foot analysis.
Are there any identified risks related to the specific site conditions in Asheville, NC?
The data does not explicitly mention site-specific risks for Asheville, NC. However, any construction project in a new location carries inherent risks such as unforeseen geological conditions, environmental concerns, or local permitting challenges. A thorough site investigation and risk assessment should have been conducted prior to the award.
How does the duration of the contract (802 days) compare to similar military construction projects?
An 802-day (approximately 2.2 years) duration for a project of this scale and complexity is generally within the expected range for military construction. Factors like design complexity, site preparation, weather, and procurement lead times for specialized materials can influence project timelines.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912QR24R0011
Offers Received: 6
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 219 INDIAN RIVER AVE STE 201, TITUSVILLE, FL, 32796
Business Categories: Category Business, Corporate Entity Not Tax Exempt, HUBZone Firm, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $33,744,993
Exercised Options: $32,333,993
Current Obligation: $32,144,305
Subaward Activity
Number of Subawards: 7
Total Subaward Amount: $9,766,504
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2024-06-20
Current End Date: 2026-08-31
Potential End Date: 2026-08-31 00:00:00
Last Modified: 2025-10-24
More Contracts from David Boland Inc
- CAB Infrastructure - FY12 MCA PN 69489 Combat Aviation Brigade (CAB) Infrustructure, Phase 1, Wheeler Army Airfield, Oahu, HI — $68.0M (Department of Defense)
- Military - Construct the 4TH ID CAB Assault Battalion Maintenance Hangar, Fort Carson, CO — $55.4M (Department of Defense)
- Construct a 10MW Generation Plant, With Microgrid Controls — $54.3M (Department of Defense)
- Install Microgrid AT Fort Liberty, NC — $42.6M (Department of Defense)
- K NO. CMK66070001, Construction of Pueblo Pintado Community School (base With TWO Alternative Bids) With Performance Period of 480 Calendar Days — $30.7M (Department of the Interior)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)