DoD Awards $23M for Segnette State Park Floodwall Construction to David Boland Inc
Contract Overview
Contract Amount: $23,003,881 ($23.0M)
Contractor: David Boland Inc
Awarding Agency: Department of Defense
Start Date: 2009-12-23
End Date: 2011-08-25
Contract Duration: 610 days
Daily Burn Rate: $37.7K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 13
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: TASK ORDER FOR WBV-24 SEGNETTE STATE PARK FLOODWALL
Place of Performance
Location: NEW ORLEANS, ORLEANS County, LOUISIANA, 70118
Plain-Language Summary
Department of Defense obligated $23.0 million to DAVID BOLAND INC for work described as: TASK ORDER FOR WBV-24 SEGNETTE STATE PARK FLOODWALL Key points: 1. The contract value of $23M is significant for a single task order. 2. Competition was full and open, suggesting a competitive bidding process. 3. The project falls under 'Other Heavy and Civil Engineering Construction', a broad category. 4. The duration of 610 days indicates a substantial construction effort.
Value Assessment
Rating: fair
The contract value of $23M is substantial. Benchmarking against similar heavy civil engineering construction projects would be necessary to fully assess value, but the firm fixed price suggests cost certainty for the government.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The 'full and open competition' method is ideal for price discovery and ensuring the best value. This approach allows any qualified vendor to bid, fostering a competitive environment that should drive down costs.
Taxpayer Impact: A competitive bidding process generally leads to better pricing for taxpayers, ensuring funds are used efficiently for the required construction.
Public Impact
Enhances flood protection for Segnette State Park and surrounding areas. Supports critical infrastructure development in Louisiana. Creates jobs in the heavy and civil engineering construction sector.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen site conditions arise.
- Contract duration is lengthy, increasing exposure to market fluctuations.
Positive Signals
- Firm fixed price contract provides cost certainty.
- Full and open competition suggests competitive pricing.
Sector Analysis
This task order falls within the heavy and civil engineering construction sector, which is vital for public infrastructure. Spending in this sector can vary significantly based on federal infrastructure initiatives and disaster recovery needs.
Small Business Impact
The data indicates this was a 'full and open competition' and the awardee is DAVID BOLAND INC. Further analysis would be needed to determine if small businesses participated as prime contractors or subcontractors in this specific task order.
Oversight & Accountability
The contract was awarded by the Department of the Army. Oversight would involve monitoring project progress, quality, and adherence to the firm fixed price to ensure taxpayer funds are used effectively.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Contract duration exceeds 1.5 years.
- Potential for unforeseen site conditions in civil engineering projects.
- Reliance on a single awardee for a significant construction task.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, la, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $23.0 million to DAVID BOLAND INC. TASK ORDER FOR WBV-24 SEGNETTE STATE PARK FLOODWALL
Who is the contractor on this award?
The obligated recipient is DAVID BOLAND INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $23.0 million.
What is the period of performance?
Start: 2009-12-23. End: 2011-08-25.
What were the specific performance metrics and quality standards for the floodwall construction?
The contract details do not specify performance metrics or quality standards. Typically, such requirements would be outlined in the Statement of Work (SOW) and technical specifications. These would define the engineering requirements, materials, construction methods, and acceptance criteria to ensure the floodwall meets its intended purpose and durability.
Were there any significant change orders or modifications to the original contract scope or price?
The provided data does not indicate any change orders or modifications. However, for a contract spanning over 600 days, it is common to have modifications due to unforeseen circumstances, design adjustments, or scope changes. A review of the contract's official modification history would be necessary to confirm.
How does the final cost compare to the initial bid and the government's estimate for this project?
The award amount is $23,003,880.71, and the contract type is 'Firm Fixed Price'. This implies the price was set before work began. Without the initial bid details or the government's estimate, a direct comparison is not possible. However, the 'full and open competition' suggests the awarded price was competitive.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCT NONBUILDING FACILITIES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W912P810B0017
Offers Received: 13
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 509 S PALM AVE, TITUSVILLE, FL, 32796
Business Categories: Category Business, Emerging Small Business, HUBZone Firm, Not Designated a Small Business, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $23,003,881
Exercised Options: $23,003,881
Current Obligation: $23,003,881
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2009-12-23
Current End Date: 2011-08-25
Potential End Date: 2011-08-25 00:00:00
Last Modified: 2021-02-25
More Contracts from David Boland Inc
- CAB Infrastructure - FY12 MCA PN 69489 Combat Aviation Brigade (CAB) Infrustructure, Phase 1, Wheeler Army Airfield, Oahu, HI — $68.0M (Department of Defense)
- Military - Construct the 4TH ID CAB Assault Battalion Maintenance Hangar, Fort Carson, CO — $55.4M (Department of Defense)
- Construct a 10MW Generation Plant, With Microgrid Controls — $54.3M (Department of Defense)
- Install Microgrid AT Fort Liberty, NC — $42.6M (Department of Defense)
- Design BID Build for Construction of Army Reserve Center, Vehicle Maintenance Shop, and Organizational (unheated) Storage Building in Asheville, NC — $32.1M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)