CDM Federal Programs Corporation Contracts with Environmental Protection Agency
Relationship Overview
Total Contract Value: $318,020,801
Contract Count: 19
Average Contract Size: $16.7M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $314.2M (18 contracts)
- Environmental: $3.8M (1 contracts)
Contracts
- THIS REMEDIAL ACTION CONTRACT 2 FULL SERVICE (RAC 2 FS) FOR EPA'S REGION 8 PROVIDES PROFESSIONAL ARCHITECT/ENGINEER, TECHNICAL, AND MANAGEMENT SERVICES TO SUPPORT REMEDIAL RESPONSE, ENFORCEMENT OVERSIGHT AND NON-TIME CRITICAL REMOVAL ACTIVITIES UNDER CERCLA, AS AMENDED BY SARA; AND THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT PURSUANT TO THE FEDERAL RESPONSE PLAN (FRP) AND OTHER LAWS TO HELP ADDRESS AND/OR MITIGATE ENDANGERMENT TO THE PUBLIC HEALTH, WELFARE OR ENVIRONMENT, AND TO SUPPORT STATES AND COMMUNITIES IN PREPARING FOR RESPONSES TO RELEASES OF HAZARDOUS SUBSTANCES, AS WELL AS COUNTER-TERRORISM. — $145.9M
- REGION III RACS II — $51.5M
- R10 DES - PORTLAND HARBOR SUPERFUND SITE REMEDIAL DESIGN SERVICES — $46.0M
- EPA REGION 8 DES TASK ORDER SILVER BOW CREEK / BUTTE AREA SUPERFUND SITE (SBCBA) BUTTE MINE FLOODING OU3; ROCKER OU7; BUTTE PRIORITY SOILS OU8 — $15.0M
- THIS TASK ORDER IS FOR THE LEAD SERVICE LINE INVENTORIES FOR THE STATE OF CALIFORNIA. — $7.5M
- DES - MCLOUTH STEEL CORP (MSC) TRENTON RI/FS — $6.9M
- DES - MOYERS LANDFILL SUPERFUND SITE REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) — $5.3M
- RAF DES TASK ORDER FOR SILVER BOW OU13; FEASIBILITY STUDY(FS) THROUGH ROD WITH OVERSIGHT OF REMEDIAL DESIGN(RD) AND REMEDIAL ACTION(RA) — $5.2M
- R10 DES: HAMILTON LABREE SUPERFUND SITE-WIDE REMEDIAL INVESTIGATION / FEASIBILITY STUDY (RI/FS) TECHNICAL SUPPORT — $4.9M
- DES CABO ROJO REMEDIAL DESIGN — $4.5M
- DES WAPPINGER CREEK REMEDIAL INVESTIGATION AND FEASIBILITY STUDY — $4.1M
- CONSULTING SERVICES TO SUPPORT ENFORCEMENT OF THE COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA, A.K.A. SUPERFUND) AND THE RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) — $4.0M
- R10 DES: ALKALI LAKE SUPERFUND SITE OVERSIGHT SUPPORT OF A REMEDIAL INVESTIGATION / FEASIBILITY STUDY (RI/FS) BEING CONDUCTED BY THE POTENTIALLY RESPONSIBLE PARTY. — $3.8M
- DES TASK ORDER, COLUMBIA FALLS, ANACONDA ALUMINUM, RI/FS OS, NEGOTIATION SUPPORT, RD/RA OS — $3.7M
- PSC F115 - CALL ORDER FOR PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) SITE REMEDIATION ENFORCEMENT SERVICES IN SUPPORT OF ENFORCEMENT OF THE COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA, A.K.A. SUPERFUND) AND THE RESOU — $3.2M
- WARM SPRINGS PONDS OPERABLE UNITS 4 AND 12 REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) — $2.1M
- R7 DES ORONOGO-DUENWEG MINING BELT, OPERABLE UNIT 4, GROUNDWATER INVENTORY OF WELLS, SAMPLING, AND TECHNICAL IMPRACTICABILITY WAIVER WORKPLAN — $2.1M
- R7 DES NEWTON COUNTY MINE TAILINGS OPERABLE UNIT 4 GROUNDWATER INVENTORY OF WELLS, SAMPLING, AND TECHNICAL IMPRACTICABILITY WAIVER WORKPLAN — $1.6M
- CAYUGA GROUNDWATER CONTAMINATION OU 1 AND OU2 - REMEDIAL ACTION OVERSIGHT — $772.6K
Frequently Asked Questions
How many contracts does CDM Federal Programs Corporation have with Environmental Protection Agency?
CDM Federal Programs Corporation has 19 contracts with Environmental Protection Agency worth a combined $318.0M.
What is the average contract size between CDM Federal Programs Corporation and Environmental Protection Agency?
The average contract size is $16.7M.
What percentage of CDM Federal Programs Corporation's contracts with Environmental Protection Agency are sole-source?
0% of the contracts are sole-source awards.