DoD Awards $58.9M for Joint Base Lewis-McChord Emergency Power Plant Replacement
Contract Overview
Contract Amount: $58,871,799 ($58.9M)
Contractor: Structsure Projects Inc
Awarding Agency: Department of Defense
Start Date: 2023-09-22
End Date: 2028-06-28
Contract Duration: 1,741 days
Daily Burn Rate: $33.8K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: DESIGN BUILD INITIAL OUTFITTING PROJECT FOR EMERGENCY POWER PLANT REPLACEMENT FOR JOINT BASE LEWIS-MCCHORD, MADIGAN ARMY MEDICAL CENTER, WA.
Place of Performance
Location: JOINT BASE LEWIS MCCHORD, PIERCE County, WASHINGTON, 98431
Plain-Language Summary
Department of Defense obligated $58.9 million to STRUCTSURE PROJECTS INC for work described as: DESIGN BUILD INITIAL OUTFITTING PROJECT FOR EMERGENCY POWER PLANT REPLACEMENT FOR JOINT BASE LEWIS-MCCHORD, MADIGAN ARMY MEDICAL CENTER, WA. Key points: 1. The contract is for a critical infrastructure project at a major military medical center. 2. StructSure Projects Inc. is the prime contractor for this significant construction effort. 3. The project aims to ensure reliable emergency power for Madigan Army Medical Center. 4. This award represents a substantial investment in facility modernization and resilience.
Value Assessment
Rating: good
The award amount of $58.9 million appears reasonable for a large-scale design-build project involving critical infrastructure replacement. Benchmarking against similar hospital or critical facility construction projects would provide further context on pricing efficiency.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, suggesting a robust price discovery process. This method typically leads to more competitive pricing as multiple qualified contractors can bid.
Taxpayer Impact: Taxpayer funds are being used for a necessary infrastructure upgrade to ensure continuity of essential services at a military medical facility.
Public Impact
Ensures uninterrupted critical power for patient care at Madigan Army Medical Center during emergencies. Modernizes aging infrastructure, improving reliability and reducing future maintenance costs. Supports the operational readiness of Joint Base Lewis-McChord by safeguarding essential services.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns in large design-build projects.
- Schedule delays impacting critical power availability.
- Ensuring long-term operational and maintenance effectiveness of the new plant.
Positive Signals
- Awarded under full and open competition.
- Addresses a critical need for emergency power.
- Long-term contract duration allows for phased execution.
Sector Analysis
This project falls within the Commercial and Institutional Building Construction sector. Spending in this sector for federal facilities is often driven by modernization needs, infrastructure resilience, and compliance with updated building codes and energy standards.
Small Business Impact
The data indicates no specific set-aside for small businesses, and the prime contractor is not identified as a small business. Opportunities for small businesses may exist as subcontractors for specialized services or materials.
Oversight & Accountability
The Department of the Army, through the Department of Defense, is responsible for oversight. The firm fixed-price contract type provides some cost control, but ongoing monitoring of performance and schedule is crucial.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Critical infrastructure dependency.
- Potential for construction delays.
- Complexity of design-build integration.
- Ensuring long-term operational readiness.
- Coordination with active medical facility operations.
Tags
commercial-and-institutional-building-co, department-of-defense, wa, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $58.9 million to STRUCTSURE PROJECTS INC. DESIGN BUILD INITIAL OUTFITTING PROJECT FOR EMERGENCY POWER PLANT REPLACEMENT FOR JOINT BASE LEWIS-MCCHORD, MADIGAN ARMY MEDICAL CENTER, WA.
Who is the contractor on this award?
The obligated recipient is STRUCTSURE PROJECTS INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $58.9 million.
What is the period of performance?
Start: 2023-09-22. End: 2028-06-28.
What is the specific risk associated with the 'Emergency Power Plant Replacement' and how is it being mitigated?
The primary risk is the potential failure of existing power systems, which could disrupt critical medical services at Madigan Army Medical Center. Mitigation involves the timely design and construction of a new, reliable emergency power plant, ensuring redundancy and adherence to stringent performance standards throughout the project lifecycle.
How does the 'Full and Open Competition' impact the overall value and cost-effectiveness of this contract?
Full and open competition generally enhances value by fostering a competitive bidding environment, which tends to drive down prices and encourage innovative solutions. This increases the likelihood that the government secures the best possible price and quality for the $58.9 million investment in the emergency power plant.
What are the key performance indicators (KPIs) for ensuring the effectiveness of this project upon completion?
Key KPIs would include the successful commissioning of the new power plant meeting all specified load requirements, adherence to the project schedule and budget, and demonstrated reliability during simulated emergency power tests. Long-term effectiveness will be measured by reduced downtime and maintenance costs compared to the previous system.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: W9127S20R6018
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 903 E 104TH ST, KANSAS CITY, MO, 64131
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $58,871,799
Exercised Options: $58,871,799
Current Obligation: $58,871,799
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W9127S23D6024
IDV Type: IDC
Timeline
Start Date: 2023-09-22
Current End Date: 2028-06-28
Potential End Date: 2028-06-28 00:00:00
Last Modified: 2025-07-24
More Contracts from Structsure Projects Inc
- THE Defense Health Agency-Facilities Enterprise Requires Design, Construction, Initial Outfitting, and Transition Services for the FY23 FT Bragg Womack Army Medical Center Surgical Suite Expansion and Blood Donor Center Addition-Alteration Project — $107.0M (Department of Defense)
- Medical Center Realignment, 99TH Medical Group, Nellis AIR Force Base, Nevada: Structural and Electrical Repairs; Replace Clean Steam System and AIR Handling Units; Elevator CAB Repairs; Site Improvements; Fire and Life Safety Repairs; Addition to Warehouse; Initial Outfitting; and Building Demolition — $94.0M (Department of Defense)
- Constsvcs-Ambulatory Care Center, PH 4-Jbsa — $79.9M (Department of Defense)
- Dunn Dental Clinic Construction — $75.9M (Department of Defense)
- Construct a NEW LAW Atct AT the Lawton Fort-Sill Regional Airport in Lawton, OK — $63.9M (Department of Transportation)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)