DHA Awards $107M for Ft. Bragg Medical Center Expansion and Blood Donor Center Addition
Contract Overview
Contract Amount: $107,025,025 ($107.0M)
Contractor: Structsure Projects Inc
Awarding Agency: Department of Defense
Start Date: 2023-09-20
End Date: 2029-02-24
Contract Duration: 1,984 days
Daily Burn Rate: $53.9K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: THE DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE REQUIRES DESIGN, CONSTRUCTION, INITIAL OUTFITTING, AND TRANSITION SERVICES FOR THE FY23 FT BRAGG WOMACK ARMY MEDICAL CENTER SURGICAL SUITE EXPANSION AND BLOOD DONOR CENTER ADDITION-ALTERATION PROJECT.
Place of Performance
Location: FORT BRAGG, CUMBERLAND County, NORTH CAROLINA, 28310
Plain-Language Summary
Department of Defense obligated $107.0 million to STRUCTSURE PROJECTS INC for work described as: THE DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE REQUIRES DESIGN, CONSTRUCTION, INITIAL OUTFITTING, AND TRANSITION SERVICES FOR THE FY23 FT BRAGG WOMACK ARMY MEDICAL CENTER SURGICAL SUITE EXPANSION AND BLOOD DONOR CENTER ADDITION-ALTERATION PROJECT. Key points: 1. Project scope includes design, construction, outfitting, and transition for surgical suite expansion and blood donor center. 2. The contract is a firm-fixed-price delivery order, indicating clear cost expectations. 3. Competition was full and open, suggesting a competitive bidding process. 4. The project is located in North Carolina and falls under Commercial and Institutional Building Construction.
Value Assessment
Rating: good
The contract value of $107M for a medical center expansion and addition appears reasonable given the scope. Benchmarking against similar large-scale healthcare construction projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, which typically fosters competitive pricing and ensures the government receives the best value. The use of a delivery order under a larger contract structure implies a pre-established framework for pricing.
Taxpayer Impact: The competitive award process aims to ensure taxpayer funds are used efficiently for this critical healthcare infrastructure project.
Public Impact
Enhances surgical capacity at Womack Army Medical Center, improving care for service members and their families. Expands blood donor services, crucial for maintaining adequate blood supplies for military operations and medical needs. Supports local economy through construction jobs and related services in North Carolina. Modernizes healthcare facilities, ensuring advanced medical treatment capabilities.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns in large construction projects.
- Coordination challenges between design, construction, and outfitting phases.
- Long project duration (nearly 5 years) increases risk of scope creep or changing requirements.
Positive Signals
- Firm-fixed-price contract limits cost uncertainty for the government.
- Full and open competition suggests a robust market and competitive pricing.
- Experienced contractor (StructurSure Projects Inc.) likely brings valuable expertise.
Sector Analysis
This project falls within the Commercial and Institutional Building Construction sector, specifically for healthcare facilities. Spending in this sector can vary significantly based on project size, complexity, and location. Benchmarks for similar medical facility expansions would be relevant.
Small Business Impact
While the prime contractor is StructurSure Projects Inc., the contract details do not specify any small business subcontracting goals or participation. Further investigation into the subcontracting plan would be necessary to assess small business impact.
Oversight & Accountability
The Department of Defense, through the Defense Health Agency and Department of the Army, is responsible for oversight. The firm-fixed-price contract and delivery order structure provide a degree of accountability for the contractor's performance and cost.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Long project duration increases exposure to market fluctuations and potential requirement changes.
- Complexity of integrating new surgical suites with existing hospital infrastructure.
- Dependence on specialized medical equipment and technology.
- Potential for unforeseen site conditions during construction.
- Ensuring seamless transition and minimal disruption to ongoing medical services.
Tags
commercial-and-institutional-building-co, department-of-defense, nc, delivery-order, 100m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $107.0 million to STRUCTSURE PROJECTS INC. THE DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE REQUIRES DESIGN, CONSTRUCTION, INITIAL OUTFITTING, AND TRANSITION SERVICES FOR THE FY23 FT BRAGG WOMACK ARMY MEDICAL CENTER SURGICAL SUITE EXPANSION AND BLOOD DONOR CENTER ADDITION-ALTERATION PROJECT.
Who is the contractor on this award?
The obligated recipient is STRUCTSURE PROJECTS INC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $107.0 million.
What is the period of performance?
Start: 2023-09-20. End: 2029-02-24.
What is the estimated cost per square foot for the surgical suite expansion and blood donor center addition, and how does it compare to industry benchmarks for similar healthcare construction projects
The provided data does not include square footage, making a direct cost per square foot calculation impossible. To assess value, this metric would need to be obtained and compared against regional and national benchmarks for healthcare construction. Factors like specialized equipment, advanced HVAC, and stringent building codes for medical facilities can significantly influence per-square-foot costs compared to standard commercial buildings.
What are the key performance indicators (KPIs) and milestones defined in the contract to monitor progress and ensure timely completion of the project, given its nearly five-year duration?
The contract specifies a duration of 1984 days (approximately 5.4 years) with an end date of February 24, 2029. While specific KPIs and detailed milestones are not listed in the provided summary, a project of this magnitude typically includes phased deliverables, regular progress reports, site inspections, and adherence to a detailed project schedule. The firm-fixed-price nature incentivizes the contractor to manage these effectively to avoid cost overruns.
How will the effectiveness of the expanded surgical suite and blood donor center be measured post-completion to ensure it meets the operational needs of the Ft. Bragg Womack Army Medical Center?
Effectiveness will likely be measured through post-occupancy evaluations focusing on operational efficiency, patient throughput in the surgical suites, and the reliability of blood supply from the donor center. Key metrics could include reduced patient wait times, increased surgical case volume, successful blood collection targets, and positive feedback from medical staff and patients. The DHA's facility management and clinical leadership will be responsible for these assessments.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: W9127S20R6018
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 903 E 104TH ST, KANSAS CITY, MO, 64131
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $107,025,025
Exercised Options: $107,025,025
Current Obligation: $107,025,025
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W9127S23D6024
IDV Type: IDC
Timeline
Start Date: 2023-09-20
Current End Date: 2029-02-24
Potential End Date: 2029-02-24 00:00:00
Last Modified: 2025-09-29
More Contracts from Structsure Projects Inc
- Medical Center Realignment, 99TH Medical Group, Nellis AIR Force Base, Nevada: Structural and Electrical Repairs; Replace Clean Steam System and AIR Handling Units; Elevator CAB Repairs; Site Improvements; Fire and Life Safety Repairs; Addition to Warehouse; Initial Outfitting; and Building Demolition — $94.0M (Department of Defense)
- Constsvcs-Ambulatory Care Center, PH 4-Jbsa — $79.9M (Department of Defense)
- Dunn Dental Clinic Construction — $75.9M (Department of Defense)
- Construct a NEW LAW Atct AT the Lawton Fort-Sill Regional Airport in Lawton, OK — $63.9M (Department of Transportation)
- Design Build Initial Outfitting Project for Emergency Power Plant Replacement for Joint Base Lewis-Mcchord, Madigan Army Medical Center, WA — $58.9M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)