Manson Construction CO Contracts with Department of Defense
Relationship Overview
Total Contract Value: $2,031,722,885
Contract Count: 50
Average Contract Size: $40.6M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Construction: $2.0B (50 contracts)
Contracts
- P327 DEMOLITION AND REPLACEMENT OF PIER 12 AND UPGRADE TO PIER 13, NAVAL BASE SAN DIEGO, SAN DIEGO, CA — $117.4M
- P508: FLOATING DRY DOCK MOORING FACILITY — $110.9M
- P443 DB CONSTRUCTION PIER 6 REPLACEMENT NBSD — $108.9M
- CONSTRUCTION CONTRACT FOR P440 — $96.3M
- IGF::OT::IGF HYDRAULIC BEACH FILL — $93.8M
- P834 - SEAWOLF CLASS SERVICE PIER EXTENSION, NAVAL BASE KITSAP BANGOR, SILVERDALE, WA — $93.0M
- WEST COAST HOPPER MAINTENANCE DREDGING 2023 — $77.1M
- NORFOLK HARBOR ATLANTIC OCEAN CHANNEL DREDGING PHASE 2 — $70.6M
- DESIGN-BID-BUILD (BBD), FIRM-FIXED-PRICE (FFP), CONSTRUCTION CONTRACT FOR P021 LIGHTERAGE AND SMALL CRAFT FACILITY AT MARINE CORP SUPPORT FACILITY (MCSF) BLOUNT ISLAND COMMAND (BIC), JACKSONVILLE, FLORIDA. — $61.1M
- PASSES OF THE MISSISSIPPI RIVER, SOUTH PASS MAINTENANCE DREDGING #20-1, PLAQUEMINES PARISH, LOUISIANA (OM-ED-027) — $52.7M
- IGF::OT::IGF DREDGING 1ST CYC-CHANNEL ISLANDS, VENTURA COUNTY, CA — $50.9M
- TAS::96 3135::TAS RECCOVERY (ARRA) -- ANCHORAGE HARBOR TRANSITIONAL AND MAINTENANCE DREDGING ARRA::YES::ARRA — $46.6M
- IGF::CT::IGF MILE POINT TRAINING WALL RECONFIGURATION PROJECT CONSISTS OF CONSTRUCTING APPROXIMATELY 4,000 FEET OF A NEW WEST LEG TRAINING WALL, REMOVING APPROXIMATELY 3,300 FEET OF THE WESTERLY END OF THE EXISTING TRAINING WALL, CONSTRUCTING APPROXIMATELY 2,100 FEET OF A NEW EAST LEG TRAINING WALL AND DREDGING THE CONFLUENCE AREA AND THE FLOW IMPROVEMENT CHANNEL. IGF::CT::IGF — $42.6M
- HYDRAULIC BEACH FILL — $42.0M
- TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::105152::RP# PORT OF LONG BEACH (DEEPENING) AND OTHER LONG BEACH PROJECTS, SAN PEDRO BAY, LOS ANGELES COUNTY, CA THE PROJECT CONSISTS OF FILLING THE NORTHERN PORTION OF THE SLIP G AREA TO CREATE LAND. THIS WORK INCLUDES CONSTRUCITON OF ROCK DIKE, DREDGING, FILL OPERATIONS, WICK DRAIN INSTALLATION, SETTLEMENT MONITORING, ETC. ALSO DEEPENING OF THE PORT OF LONG BEACH (POLB) TRUNING BASIN TO - 76 FT. APPROXIMATELY 600,00 CUBIC YARDS — $39.9M
- IGF::OT::IGF HYDRAULIC BEACH FILL. — $39.5M
- DREDGING-MISS RIVER SHIP CHANNEL — $38.7M
- DREDGING — $38.4M
- NEW ORLEANS TO VENICE, NON FEDERAL LEVEE, FRITCHIE BRACKISH MARSH — $35.4M
- DREDGING — $35.3M
Frequently Asked Questions
How many contracts does Manson Construction CO have with Department of Defense?
Manson Construction CO has 50 contracts with Department of Defense worth a combined $2.0B.
What is the average contract size between Manson Construction CO and Department of Defense?
The average contract size is $40.6M.
What percentage of Manson Construction CO's contracts with Department of Defense are sole-source?
0% of the contracts are sole-source awards.