HDR Engineering, Inc. Contracts with Department of Transportation
Relationship Overview
Total Contract Value: $6,855,861
Contract Count: 6
Average Contract Size: $1.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Transportation: $4.8M (4 contracts)
- Construction: $2.0M (1 contracts)
- Engineering Services: $49.1K (1 contracts)
Contracts
- CA NP MOJA 11(2) 10(2) KELSO CIMA & KELBAKER ROADS 30% DESIGN TASK ORDER — $3.3M
- OR DOT 18(1), OR58 COAST FORK WILLAMETTE RIVER TO LOWER SALT CR BRIDGES CI/CPE SERVICES — $2.0M
- WY BR WYAO US20(1) US 20 AND HAYDEN ARCH BRIDGE REPAIRS 30% DESIGN TASK ORDER — $1.1M
- AE CI/CPE SERVICES FOR WA ERFO FS MTBKR605 2020-1(1), MT. BAKER SNOQUALMIE ERFO REPAIRS 2020, PHASE 1 & WA ERFO FS MTBKR605 2022-1(1), MT. BAKER SNOQUALMIE ERFO REPAIRS 2022 — $286.7K
- CO FLPP NPS SPECIAL PROJECTS PILOTS AND STUDIES THE PURPOSE OF THIS TASK ORDER IS TO DEVELOP A VISITATION SCENARIO MANAGEMENT TOOL. — $199.6K
- PROVIDE ENGINEERING SERVICES FOR PROJECT: PR FS ELYUN816 10(3) - PERFORM SUBSURFACE EXPLORATION AND LABORATORY TESTING FOR THE DELIVERY OF A GEOTECHNICAL DATA REPORT (GDR). — $49.1K
Frequently Asked Questions
How many contracts does HDR Engineering, Inc. have with Department of Transportation?
HDR Engineering, Inc. has 6 contracts with Department of Transportation worth a combined $6.9M.
What is the average contract size between HDR Engineering, Inc. and Department of Transportation?
The average contract size is $1.1M.
What percentage of HDR Engineering, Inc.'s contracts with Department of Transportation are sole-source?
0% of the contracts are sole-source awards.