Wyoming Bridge Repairs Task Order Awarded to HDR Engineering for $1.07M
Contract Overview
Contract Amount: $1,070,481 ($1.1M)
Contractor: HDR Engineering, Inc.
Awarding Agency: Department of Transportation
Start Date: 2023-12-22
End Date: 2026-12-31
Contract Duration: 1,105 days
Daily Burn Rate: $969/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 1
Pricing Type: FIRM FIXED PRICE
Sector: Transportation
Official Description: WY BR WYAO US20(1) US 20 AND HAYDEN ARCH BRIDGE REPAIRS 30% DESIGN TASK ORDER
Place of Performance
Location: DENVER, DENVER County, COLORADO, 80202
State: Colorado Government Spending
Plain-Language Summary
Department of Transportation obligated $1.1 million to HDR ENGINEERING, INC. for work described as: WY BR WYAO US20(1) US 20 AND HAYDEN ARCH BRIDGE REPAIRS 30% DESIGN TASK ORDER Key points: 1. Contract awarded for 30% design of Hayden Arch Bridge repairs. 2. HDR Engineering, Inc. is the prime contractor. 3. Federal Highway Administration is the contracting agency. 4. Task order is Firm Fixed Price. 5. Project duration is 1105 days.
Value Assessment
Rating: good
The contract value of $1.07M for a 30% design task order appears reasonable given the scope of engineering services required for bridge repairs. Benchmarking against similar large-scale bridge design projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, indicating a competitive bidding process. This method generally promotes price discovery and ensures fair market value is obtained for the services.
Taxpayer Impact: The taxpayer impact is expected to be managed effectively due to the competitive award process, ensuring funds are used efficiently for necessary infrastructure improvements.
Public Impact
Enhances transportation infrastructure safety and reliability in Wyoming. Supports local economy through engineering and potential construction jobs. Ensures compliance with federal transportation standards.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for scope creep in design phase.
- Risk of schedule delays impacting repair timeline.
Positive Signals
- Firm Fixed Price contract mitigates cost overrun risk.
- Full and open competition suggests competitive pricing.
- Experienced contractor selected.
Sector Analysis
This contract falls within the Engineering Services sector, specifically related to transportation infrastructure. Spending in this sector is crucial for maintaining and upgrading national transportation networks, with typical project costs varying widely based on complexity and scale.
Small Business Impact
No information is available regarding small business participation in this specific task order. Further analysis would be needed to determine if small businesses were subcontracted or involved in the bidding process.
Oversight & Accountability
The Federal Highway Administration is responsible for oversight of this contract. The firm fixed price and defined scope aim to provide clear accountability for the contractor's performance.
Related Government Programs
- Engineering Services
- Department of Transportation Contracting
- Federal Highway Administration Programs
Risk Flags
- Potential for schedule slippage.
- Scope definition clarity for future phases.
- Contractor performance history review needed.
- Dependency on subsequent funding for full repairs.
Tags
engineering-services, department-of-transportation, co, delivery-order, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $1.1 million to HDR ENGINEERING, INC.. WY BR WYAO US20(1) US 20 AND HAYDEN ARCH BRIDGE REPAIRS 30% DESIGN TASK ORDER
Who is the contractor on this award?
The obligated recipient is HDR ENGINEERING, INC..
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Highway Administration).
What is the total obligated amount?
The obligated amount is $1.1 million.
What is the period of performance?
Start: 2023-12-22. End: 2026-12-31.
What is the estimated total cost for the full bridge repair project, and how does this design task order cost compare?
The provided data only details the cost for the 30% design task order ($1.07M). Information regarding the total estimated cost for the complete Hayden Arch Bridge repairs is not available. A comparison of the design cost to the overall project budget would be necessary to assess its proportion and potential value.
What are the specific risks associated with the Hayden Arch Bridge that necessitate these repairs, and how are they being addressed in the design?
The data does not specify the exact structural issues or risks associated with the Hayden Arch Bridge. The 30% design task order implies a preliminary phase focused on developing repair strategies. A detailed review of the design documents would be required to understand the identified risks and the proposed mitigation measures.
How will the effectiveness of the completed bridge repairs be measured and ensured by the Federal Highway Administration?
Effectiveness will likely be measured through post-construction inspections, structural integrity testing, and ongoing monitoring to ensure the repairs meet design specifications and address the original issues. The Federal Highway Administration's oversight throughout the design and construction phases is key to ensuring the long-term effectiveness of the repairs.
Industry Classification
NAICS: Professional, Scientific, and Technical Services › Architectural, Engineering, and Related Services › Engineering Services
Product/Service Code: ARCHITECT/ENGINEER SERVICES › ARCH-ENG SVCS - CONSTRUCTION
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Offers Received: 1
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: HDR, Inc
Address: 1670 BROADWAY STE 3400, DENVER, CO, 80202
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $1,070,481
Exercised Options: $1,070,481
Current Obligation: $1,070,481
Actual Outlays: $529,302
Subaward Activity
Number of Subawards: 2
Total Subaward Amount: $111,910
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: YES
Parent Contract
Parent Award PIID: 6982AF22D000002
IDV Type: IDC
Timeline
Start Date: 2023-12-22
Current End Date: 2026-12-31
Potential End Date: 2026-12-31 00:00:00
Last Modified: 2026-04-03
More Contracts from HDR Engineering, Inc.
- Architect Engineer Service for Design-Bid-Build, Full Plans and Specifications for Project FY24 Mcon Project P-716 RED Hill Water Treatment Facility, Jbphh (RED Hill), HI — $23.6M (Department of Defense)
- Marine Corps Installation Command Master Planning Support — $16.8M (Department of Defense)
- Grca 318719 - Cd/Ss/Compliance Rehabilit — $12.5M (Department of the Interior)
- GC DAM Right Powerhouse (RPH) and Left Powerhouse (LPH) Station Service Equipment — $4.4M (Department of the Interior)
- CA NP Moja 11(2) 10(2) Kelso Cima & Kelbaker Roads 30% Design Task Order — $3.3M (Department of Transportation)
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)