HDR Engineering, Inc. Contracts with Department of the Interior
Relationship Overview
Total Contract Value: $21,511,390
Contract Count: 7
Average Contract Size: $3.1M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- Other: $15.5M (5 contracts)
- Energy: $4.4M (1 contracts)
- Construction: $1.6M (1 contracts)
Contracts
- GRCA 318719 - CD/SS/COMPLIANCE REHABILIT — $12.5M
- GC DAM RIGHT POWERHOUSE (RPH) AND LEFT POWERHOUSE (LPH) STATION SERVICE EQUIPMENT — $4.4M
- ENGINEERING SERVICES - BANNOK PUMPING PLANT — $2.2M
- ZION 240182 SOUTH ENTRANCE BRIDGE DESIGN — $1.6M
- GRCA 352119 - NR CRITICAL UTILITY RESTOR — $431.4K
- 2025 COMPREHENSIVE REVIEWS GROUP 1 — $221.1K
- FLATHEAD RIVER PUMPING PLANTS - PUMPING UNITS CONDITION ASSESSMENT AND REHABILITATION — $172.6K
Frequently Asked Questions
How many contracts does HDR Engineering, Inc. have with Department of the Interior?
HDR Engineering, Inc. has 7 contracts with Department of the Interior worth a combined $21.5M.
What is the average contract size between HDR Engineering, Inc. and Department of the Interior?
The average contract size is $3.1M.
What percentage of HDR Engineering, Inc.'s contracts with Department of the Interior are sole-source?
0% of the contracts are sole-source awards.