DoD Awards $29.8M for Armed Forces Reserve Center Construction to Garco Construction
Contract Overview
Contract Amount: $29,829,432 ($29.8M)
Contractor: Garco Construction, Inc.
Awarding Agency: Department of Defense
Start Date: 2007-06-13
End Date: 2009-11-09
Contract Duration: 880 days
Daily Burn Rate: $33.9K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 4
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: DESIGN AND CONSTRUCT US ARMED FORCES RESERVE CENTER
Place of Performance
Location: FAIRCHILD AFB, SPOKANE County, WASHINGTON, 99011
Plain-Language Summary
Department of Defense obligated $29.8 million to GARCO CONSTRUCTION, INC. for work described as: DESIGN AND CONSTRUCT US ARMED FORCES RESERVE CENTER Key points: 1. Contract awarded for design and construction of a reserve center. 2. Full and open competition was utilized. 3. The contract was firm-fixed-price, indicating price certainty. 4. The project duration was 880 days.
Value Assessment
Rating: fair
The award amount of $29.8 million for a reserve center construction project appears within a reasonable range for such a facility. However, without specific details on the size, scope, and location, a precise comparison is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition is a positive indicator for price discovery. This method allows all eligible contractors to bid, fostering a competitive environment that should drive down costs.
Taxpayer Impact: The competitive bidding process likely resulted in a fair market price, maximizing the value of taxpayer dollars for this infrastructure project.
Public Impact
Supports military readiness by providing necessary facilities for reserve forces. Contributes to local economy through construction jobs and material sourcing. Enhances community infrastructure with a new federal facility.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- No small business participation noted.
- Project duration is substantial, increasing risk of cost overruns or delays.
Positive Signals
- Full and open competition utilized.
- Firm-fixed-price contract provides cost certainty.
Sector Analysis
The construction sector is highly competitive, with significant government spending on infrastructure. Benchmarks for similar projects would depend heavily on geographic location, size, and specific requirements.
Small Business Impact
The data indicates that small business participation was not a factor in this contract award. Future solicitations could consider set-asides or incentives to encourage small business involvement.
Oversight & Accountability
The Department of the Army awarded this contract, implying oversight from a federal agency. However, specific oversight mechanisms and accountability measures are not detailed in the provided data.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for schedule delays due to project complexity and duration.
- Lack of small business participation.
- No data on post-award performance or cost adjustments.
- Limited insight into specific project requirements and quality standards.
Tags
commercial-and-institutional-building-co, department-of-defense, wa, dca, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $29.8 million to GARCO CONSTRUCTION, INC.. DESIGN AND CONSTRUCT US ARMED FORCES RESERVE CENTER
Who is the contractor on this award?
The obligated recipient is GARCO CONSTRUCTION, INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $29.8 million.
What is the period of performance?
Start: 2007-06-13. End: 2009-11-09.
What was the final cost compared to the initial bid or estimated cost?
The provided data does not include information on the initial bid or estimated cost, nor does it detail any change orders or final cost adjustments. To assess the value effectively, a comparison between the awarded amount and the initial estimates or bids would be necessary.
Were there any significant delays or cost overruns during the project's execution?
The data indicates a planned duration of 880 days. Without post-award performance data, it's impossible to determine if the project experienced delays or cost overruns. Monitoring project completion against the planned schedule and budget is crucial for assessing risk.
How does the cost per square foot compare to similar reserve center construction projects?
To assess effectiveness, a cost per square foot benchmark is needed. This requires knowing the total square footage of the completed facility and comparing it to similar projects in comparable geographic regions. This data is not available in the provided information.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912QR06R0085
Offers Received: 4
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 4114 E BROADWAY AVE, SPOKANE, WA, 05
Business Categories: Category Business, Not Designated a Small Business
Financial Breakdown
Contract Ceiling: $30,779,432
Exercised Options: $29,829,432
Current Obligation: $29,829,432
Contract Characteristics
Cost or Pricing Data: NO
Timeline
Start Date: 2007-06-13
Current End Date: 2009-11-09
Potential End Date: 2009-11-09 00:00:00
Last Modified: 2010-06-06
More Contracts from Garco Construction, Inc.
- Cefp Intake, Gate&helix Project, Yakima River Basin Enhancement Project, Integrated Yakima Project, Washington — $88.4M (Department of the Interior)
- Lower Granite Juvenile Fish Facility Phase 1A — $69.2M (Department of Defense)
- 29 6-Plex Bldgs and 6 4-Plex Bldgs — $59.0M (Department of Defense)
- Construction of P856 Manchester Tank Farm Improvements, Manchester, WA — $56.7M (Department of Defense)
- CLE Elum DAM Fish Passage Facility Adult Facility, Yakima River Basin Water Enhancement Project, Washington — $55.8M (Department of the Interior)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)