Nasa Integrated Learning and Development Program Clin 0001, Program OP-- MOD Numbers Will NOT RUN Sequential
Contract Overview
Contract Amount: $18,933,150 ($18.9M)
Contractor: AS and D, LLC
Awarding Agency: National Aeronautics and Space Administration
Start Date: 2005-08-12
End Date: 2011-04-30
Contract Duration: 2,087 days
Daily Burn Rate: $9.1K/day
Competition Type: NOT AVAILABLE FOR COMPETITION
Number of Offers Received: 1
Pricing Type: COST PLUS FIXED FEE
Official Description: NASA INTEGRATED LEARNING AND DEVELOPMENT PROGRAM CLIN 0001, PROGRAM OP-- MOD NUMBERS WILL NOT RUN SEQUENTIAL
Place of Performance
Location: ANCHORAGE, ANCHORAGE County, ALASKA, 99503
State: Alaska Government Spending
Industry Classification
NAICS: Educational Services › Business Schools and Computer and Management Training › Professional and Management Development Training
Product/Service Code: EDUCATION AND TRAINING › EDUCATION AND TRAINING SERVICES
Competition & Pricing
Extent Competed: NOT AVAILABLE FOR COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Offers Received: 1
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Parent Company: Arctic Slope Regional Corporation
Address: 3900 C STREET, STE-802, ANCHORAGE, AK, 99503
Business Categories: 8(a) Program Participant, Category Business, Minority Owned Business, Native American Owned Business, Self-Certified Small Disadvantaged Business, Small Business, Small Disadvantaged Business, Special Designations
Financial Breakdown
Contract Ceiling: $18,933,150
Exercised Options: $18,933,150
Current Obligation: $18,933,150
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Parent Contract
Parent Award PIID: NNL05AA02B
IDV Type: IDC
Timeline
Start Date: 2005-08-12
Current End Date: 2011-04-30
Potential End Date: 2011-04-30 00:00:00
Last Modified: 2025-05-14
More Contracts from AS and D, LLC
- Electrical Systems Engineering Services II (eses-Ii) the Principal Purpose of This Contract IS to Provide Electrical Engineering Support Services and Related Work to the Goddard Space Flight Center's Applied Engineering and Technology Directorate (aetd) and Related Organizations, AS Required, for the Study, Design, Development, Fabrication, Integration, Testing, Verification, and Operations of Space Flight, Airborne, and Ground System Hardware and Software, Including Development and Validation of NEW Technologies to Enable Future Space and Science Missions — $527.9M (National Aeronautics and Space Administration)
- Life Sciences - Ustdc — $438.5M (National Aeronautics and Space Administration)
- Multi-Disciplinary Engineering&technology Services II (mets II). the Purpose of This Contract IS to Acquire Engineering and Related Services to Mesad, Istd, EED, and Related Organizations, AS Required, for the Formulation, Design, Development, Fabrication, Integration, Testing, Verification, and Operations of Space Flight and Ground System Hardware and Software, Including Development and Validation of NEW Technologies to Enable Future Space and Science Missions. the Emphasis in Engineering Services Will BE in the Areas of Systems Engineering; Guidance, Navigation, and Control Systems; Instrument and Deteetor Systems and Radio Frequency (RF) Systems. to This END, the Contractor Shall Provide On/Off-Site Multidisciplinary Engineering Services, Pursuant to Task Orders Issued by the Contracting Officer. These Services Shall Include the Personnel, Facilities, and Materials (unless Otherwise Provided by the Government) to Accomplish the Tasks. in Addition, Security Clearances MAY BE Required for Some Tasks Ranging From Secret to TOP Secret and SCI, Specifically in the RF Systems Discipline — $231.9M (National Aeronautics and Space Administration)
- Lsma Final Contract Award — $79.8M (Department of Defense)
- Establish NAS Power Operations Engineering Support Task, AJW-223, Incremental Funding — $75.3M (Department of Transportation)
Other National Aeronautics and Space Administration Contracts
- International Space Station — $22.4B (THE Boeing Company)
- TAS::80 0124::TAS Design, Development, Test&evaluation of Project Orion — $15.5B (Lockheed Martin Corp)
- Provide Developmental Hardware and Test Articles, and Manufacture and Assemble Ares I Upper Stages. the Upper Stage (US) Element IS an Integral Part of the Ares I Launch Vehicle and Provides the Second Stage of Flight. the US Element IS Responsible for the Roll Control During the First Stage Burn and Separation; and Will Provide the Guidance and Navigation, Command and Data Handling, and Other Avionics Functions for the Ares I During ALL Phases of the Ascent Flight. the US Element IS a NEW Design That Emphasizes Safety, Operability, and Minimum Life Cycle Cost. the Overall Design, Development, Test and Evaluation (ddt&e), Production, and Sustaining Engineering Efforts Include Activities Performed by Three Organizations; the Nasa Design Team (NDT), the Upper Stage Production Contractor (uspc) and the Instrument Unit Production Contractor (iupc). for Clarity, the Uspc Will BE Referred to AS the Contractor Throughout This Document. Nasa IS Responsible for the Integration of the Primary Elements of the Ares I Launch Vehicle Including: the First Stage, US Including Instrument Unit (IU), and US Engine; and Will Also Integrate the Ares I Launch Vehicle AT the Launch Site. Nasa IS Responsible for the Ddt&e, Including Technical and Programmatic Integration of the US Subsystems and Government-Furnished Property. Nasa Will Lead the Effort to Develop the Requirements and Specifications of the US Element, the Development Plan and Testing Requirements, and ALL Design Documentation, Initial Manufacturing and Assembly Process Planning, Logistics Planning, and Operations Support Planning. Development, Qualification, and Acceptance Testing Will BE Conducted by Nasa and the Contractor to Satisfy Requirements and for Risk Mitigation. Nasa IS Responsible for the Overall Upper Stage Verification and Validation Process and Will Require Support From the Contractor. the Contractor IS Responsible for the Manufacture and Assembly of the Upper Stage Test Flight and Operational Upper Stage Units Including the Installation of Upper Stage Instrument Unit, the Government-Furnished US Engine, Booster Separation Motors, and Other Government-Furnished Property. a Description of the Nasa Managed and Performed Efforts IS Contained in the US Work Packages and Will BE Made Available to the Contractor to Ensure Their Understanding of the Roles and Responsibilities of the NDT, Iupc, and Contractor During the Design, Development, and Operation of the US Element. the US Conceptual Design Described in the Uso-Clv-Se-25704 US Design Definition Document (DDD) IS the Baseline Design for This Contract. the Contractors Early Role Will BE to Provide Producibility Engineering Support to Nasa VIA the Established US Office Structure and to Provide Inputs Into the Final Design Configuration, Specifications, and Standards. Nasa Will Transition the Manufacturing and Assembly, Logistics Support Infrastructure, Configuration Management, and the Sustaining Engineering Functions to the Contractor AT the KEY Points During the Development and Implementation of the Program Currently Planned to Occur NO Later Than 90 Days After the Completion of the Following Major Milestones: Manufacturing and Assembly US Preliminary Design Review (PDR) Logistics Support Infrastructure US PDR Configuration Management US Critical Design Review CDR) Sustaining Engineering US Design Certification Review (DCR) After the Completion of an Orderly Transition of Roles and Responsibilities to the Contractor, Nasa Will Assume an Insight Role Into the Contractors Production, Sustaining Engineering, and Operations Support of the Ares I US Test Program and Flight Hardware. After DCR, the Contractor Will BE Responsible for Sustaining Engineering PER SOW Section 4.7, AS Necessary to Maintain and Support the US Configuration and for Production and Operations Support — $10.5B (THE Boeing Company)
- Space Program Operations Contract (spoc) — $8.5B (United Space Alliance, LLC)
- Joint Us/Russian Human Space Flight Activities — $4.7B (Russia Space Agency)
View all National Aeronautics and Space Administration contracts →