DOT Awards $1.8M Contract for LCH ATCT Electrical Upgrade to E CORP
Contract Overview
Contract Amount: $1,815,698 ($1.8M)
Contractor: E Corp
Awarding Agency: Department of Transportation
Start Date: 2024-06-04
End Date: 2025-08-04
Contract Duration: 426 days
Daily Burn Rate: $4.3K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: LCH ATCT ELECTRICAL UPGRADE
Place of Performance
Location: LAKE CHARLES, CALCASIEU County, LOUISIANA, 70607
Plain-Language Summary
Department of Transportation obligated $1.8 million to E CORP for work described as: LCH ATCT ELECTRICAL UPGRADE Key points: 1. Contract awarded to E CORP for $1.82 million. 2. Project involves electrical upgrades at LCH ATCT. 3. Competition method was full and open after exclusion of sources. 4. Sector is Commercial and Institutional Building Construction.
Value Assessment
Rating: fair
The contract value of $1.82 million for an electrical upgrade at an Air Traffic Control Tower (ATCT) appears within a reasonable range for such specialized infrastructure projects. However, without specific details on the scope of work and comparable ATCT upgrade costs, a precise valuation is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The contract was awarded under 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES.' This suggests an initial broad solicitation followed by a more targeted approach, potentially impacting price discovery and overall competition effectiveness.
Taxpayer Impact: Taxpayer funds are being utilized for essential infrastructure upgrades to ensure the reliable operation of air traffic control systems.
Public Impact
Ensures continued safe and efficient air traffic operations. Modernizes critical electrical infrastructure at Lake Charles Regional Airport. Supports the Federal Aviation Administration's mission to maintain national airspace.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Limited competition due to exclusion of sources.
- Potential for cost overruns in specialized construction.
- Dependency on a single contractor for critical upgrades.
Positive Signals
- Addresses necessary infrastructure modernization.
- Supports aviation safety and efficiency.
Sector Analysis
This contract falls within the Commercial and Institutional Building Construction sector, specifically related to airport infrastructure. Spending in this sector is often driven by modernization needs, safety regulations, and capacity expansion, with costs varying significantly based on project complexity and location.
Small Business Impact
The data does not indicate any specific provisions or awards made to small businesses for this contract. Further analysis would be needed to determine if small businesses were involved as subcontractors or if opportunities were missed.
Oversight & Accountability
Oversight is provided by the Federal Aviation Administration (FAA) within the Department of Transportation. The contract type (Firm Fixed Price) aims to control costs, but ongoing monitoring of performance and adherence to specifications is crucial for accountability.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Transportation Contracting
- Federal Aviation Administration Programs
Risk Flags
- Limited competition.
- Potential for cost escalation.
- Dependency on contractor performance.
- Lack of detailed scope for value assessment.
Tags
commercial-and-institutional-building-co, department-of-transportation, la, delivery-order, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $1.8 million to E CORP. LCH ATCT ELECTRICAL UPGRADE
Who is the contractor on this award?
The obligated recipient is E CORP.
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Aviation Administration).
What is the total obligated amount?
The obligated amount is $1.8 million.
What is the period of performance?
Start: 2024-06-04. End: 2025-08-04.
What specific electrical systems are being upgraded, and what is the expected lifespan extension or reliability improvement?
The specific electrical systems being upgraded are not detailed in the provided data. A comprehensive understanding of the scope of work, including the types of systems (e.g., power distribution, backup generators, control systems), is necessary to assess the expected lifespan extension and reliability improvements. This information is critical for evaluating the long-term value and effectiveness of the investment.
What were the reasons for excluding certain sources, and how did this impact the final contract price?
The exclusion of sources suggests that only a subset of potential bidders met specific pre-qualification criteria, possibly related to specialized expertise, past performance, or security clearances required for ATCT facilities. While this can streamline the selection process, it may limit price competition, potentially leading to a higher final contract price than if a broader range of contractors had been considered.
How does the $1.82 million cost compare to similar ATCT electrical upgrade projects in terms of cost per square foot or per system component?
Benchmarking this $1.82 million contract against similar ATCT electrical upgrade projects is challenging without detailed project specifications. Factors like airport size, existing infrastructure complexity, specific system components being replaced, and regional labor costs significantly influence pricing. A direct comparison would require access to detailed scope-of-work documents and cost breakdowns from comparable projects.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 1598 N HILL FIELD RD, LAYTON, UT, 84041
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $1,815,698
Exercised Options: $1,815,698
Current Obligation: $1,815,698
Actual Outlays: $1,238,270
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Parent Contract
Parent Award PIID: 697DCK23G00022
IDV Type: BOA
Timeline
Start Date: 2024-06-04
Current End Date: 2025-08-04
Potential End Date: 2033-02-07 00:00:00
Last Modified: 2026-04-03
More Contracts from E Corp
- Airport Traffic Control Tower and CAB Modernization Minneapolis-Saint Paul International Airport (MSP), Minneapolis, MN Bipartisan Infrastructure LAW Funding — $10.6M (Department of Transportation)
- Design Build Project to Modernize the SLC Atct, Tracon Building and Base Building — $10.4M (Department of Transportation)
- Salt Lake City, UT AIR Route Traffic Control Center (ZLC) Underground Utilities Modernization. Scope: Modernize the Facility to Replace Underground Utilities, Renovate the Paved Surface Parking Lots and Repair Concrete and Grass Areas. the Projec — $7.8M (Department of Transportation)
- ZLA Hvac Refurbishment Project (AHU 200, 300, and 500) — $6.5M (Department of Transportation)
- THE Purpose of This Project IS to Construct a NEW Visitor Contact Station AS a Central Point of Services for Park Visitors — $4.0M (Department of the Interior)
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)