FAA Awards $8.8M for Denver TRACON Generator Building Construction to MC Dean Inc
Contract Overview
Contract Amount: $8,830,689 ($8.8M)
Contractor: M. C. Dean, Inc.
Awarding Agency: Department of Transportation
Start Date: 2024-12-13
End Date: 2026-11-06
Contract Duration: 693 days
Daily Burn Rate: $12.7K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 4
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: F35 BIL CPDS FUNDING FOR CONSTRUCTION OF ENGINE GENERATOR BUILDING AT DO1 DENVER TRACON. VENDOR: MC DEAN INC JCN: 1603914
Place of Performance
Location: DENVER, ARAPAHOE County, COLORADO, 80012
State: Colorado Government Spending
Plain-Language Summary
Department of Transportation obligated $8.8 million to M. C. DEAN, INC. for work described as: F35 BIL CPDS FUNDING FOR CONSTRUCTION OF ENGINE GENERATOR BUILDING AT DO1 DENVER TRACON. VENDOR: MC DEAN INC JCN: 1603914 Key points: 1. The contract is for the construction of an engine generator building at Denver TRACON. 2. MC Dean Inc. is the sole vendor listed, raising questions about competition. 3. The project falls under the 'Electrical Contractors and Other Wiring Installation Contractors' NAICS code. 4. The total award amount is $8,830,689.14 with a duration of 693 days.
Value Assessment
Rating: fair
The award amount of $8.8M for a generator building seems within a reasonable range for specialized construction. However, without specific cost breakdowns or benchmarks for similar FAA facilities, a precise pricing assessment is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition. However, the data only lists MC Dean Inc. as the vendor, which might indicate a subcontracting or a specific pre-qualification process not fully detailed here. Further investigation into the bidding process is warranted.
Taxpayer Impact: Taxpayer funds are being used for essential infrastructure upgrades to support air traffic control operations. The cost-effectiveness depends on the efficiency of the competition and the final price achieved.
Public Impact
Enhances critical infrastructure for air traffic control at Denver TRACON. Ensures reliable power supply for essential communication and navigation systems. Supports the operational continuity and safety of the National Airspace System. Potential for job creation within the electrical contracting and construction sectors.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Limited visibility into the specific bidding process despite 'full and open' designation.
- Potential for cost overruns if unforeseen construction challenges arise.
Positive Signals
- Addresses a critical infrastructure need for the FAA.
- Awarded to a known entity in the electrical contracting space.
- Firm fixed price contract provides cost certainty.
Sector Analysis
This contract falls within the construction and electrical contracting sector, specifically supporting critical government infrastructure. Spending benchmarks for similar projects are highly variable based on location, scope, and specific technical requirements.
Small Business Impact
The data does not indicate any specific provisions or set-asides for small businesses in this contract award. Further review would be needed to determine if small businesses were involved as subcontractors.
Oversight & Accountability
The Federal Aviation Administration is responsible for overseeing this contract. Standard procurement regulations and oversight mechanisms should be in place to ensure compliance and accountability.
Related Government Programs
- Electrical Contractors and Other Wiring Installation Contractors
- Department of Transportation Contracting
- Federal Aviation Administration Programs
Risk Flags
- Sole vendor listed despite 'full and open' competition.
- Long project duration increases risk of delays and cost overruns.
- Lack of detailed cost breakdown for pricing assessment.
- No clear indication of small business participation.
Tags
electrical-contractors-and-other-wiring-, department-of-transportation, co, delivery-order, 1m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $8.8 million to M. C. DEAN, INC.. F35 BIL CPDS FUNDING FOR CONSTRUCTION OF ENGINE GENERATOR BUILDING AT DO1 DENVER TRACON. VENDOR: MC DEAN INC JCN: 1603914
Who is the contractor on this award?
The obligated recipient is M. C. DEAN, INC..
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Aviation Administration).
What is the total obligated amount?
The obligated amount is $8.8 million.
What is the period of performance?
Start: 2024-12-13. End: 2026-11-06.
What specific factors contributed to MC Dean Inc. being the sole listed vendor under a 'full and open' competition for this project?
The designation of 'full and open' competition typically implies that all responsible sources were permitted to submit bids. The fact that only MC Dean Inc. is listed as the vendor could suggest several possibilities. It might indicate that only one bid was received, or that other bids were disqualified for not meeting technical specifications. Alternatively, it could reflect a pre-existing relationship or a specific type of contract vehicle that favored MC Dean Inc. Further details on the solicitation and evaluation process are needed for a definitive answer.
How does the $8.8 million cost compare to similar generator building construction projects for air traffic control facilities?
Benchmarking this $8.8 million cost requires detailed comparison with similar projects, considering factors like building size, complexity, specific generator requirements, and geographic location. Without access to a database of comparable FAA or similar agency construction projects, it's challenging to definitively assess if this price is high or low. However, for specialized government infrastructure, costs can often be higher due to stringent requirements and security protocols.
What are the potential risks associated with the 693-day duration of this construction project?
A project duration of 693 days (nearly two years) presents several risks. These include potential delays due to weather, supply chain disruptions, labor shortages, or unforeseen site conditions. Extended timelines can also lead to increased costs through inflation, extended project management overhead, and potential obsolescence of certain technologies or materials by project completion. Effective project management and contingency planning are crucial to mitigate these risks.
Industry Classification
NAICS: Construction › Building Equipment Contractors › Electrical Contractors and Other Wiring Installation Contractors
Product/Service Code: INSTALLATION OF EQUIPMENT › INSTALLATION OF EQUIPMENT
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Offers Received: 4
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 1765 GREENSBORO STATION PL STE 1400, TYSONS, VA, 22102
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $8,830,689
Exercised Options: $8,830,689
Current Obligation: $8,830,689
Actual Outlays: $5,412,854
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: 6973GH22D00011
IDV Type: IDC
Timeline
Start Date: 2024-12-13
Current End Date: 2026-11-06
Potential End Date: 2026-11-06 00:00:00
Last Modified: 2026-03-18
More Contracts from M. C. Dean, Inc.
- Recapitalization of Power Generation Plant and Supervisory Control and Data Acquisition (scada), Located on Buckley AFB, CO — $207.5M (Department of Defense)
- Project "EIU" — $53.0M (Department of Homeland Security)
- Adf-C Recap 1 (split Load CTR K and UPS — $45.3M (Department of Defense)
- Award for Facilities Engineering, Operations and Maintenance Services AT 10 Federal Buildings in Washington, D.C. for Option Period 3 — $44.8M (General Services Administration)
- Force Protection Technology Support Services — $40.4M (Department of Defense)
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)