THE Aerospace Corporation Contracts with National Aeronautics and Space Administration
Relationship Overview
Total Contract Value: $528,015,182
Contract Count: 23
Average Contract Size: $23.0M
Sole Source Rate: 0%
Small Business Rate: 0%
Spending by Sector
- R&D: $526.0M (22 contracts)
- Defense: $2.0M (1 contracts)
Contracts
- NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS. — $166.3M
- NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) — $141.0M
- NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS). — $48.2M
- SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE — $36.2M
- IGF::OT::IGF FUNDS FOR GOES-R GROUND PROJECT CHIEF ENGINEER AND GOES-R PROGRAM SUPPORT. AEROSPACE WILL PROVIDE SENIOR TECHNICAL SUPPORT TO THE DEVELOPMENT, INTEGRATION, AND VERIFICATION OF THE GOES-R GROUND SYSTEM ACROSS SEVERAL NASA-GSFC ENGINEERING MANAGEMENT TEAMS. THESE TEAMS WILL INCLUDE CHIEF ENGINEERING, GROUND SYSTEM PROJECT, AND PROGRAM MANAGEMENT TEAMS. WHEREAS NASA HAS OVERALL SYSTEM ENGINEERING RESPONSIBILITY FOR THE DELIVERY OF THIS LARGE SPECIALIZED GOES-R GROUND SYSTEM, CONTRACTOR SUPPORT WILL REQUIRE A STRONG BACKGROUND IN NASA PRODUCED SYSTEMS INCLUDING A THOROUGH KNOWLEDGE OF NASA PROCESSES, PROCEDURES, ENGINEERING TECHNIQUES AND APPROACHES, SPECIFICALLY RELEVANT TO NASA AND GSFC ENGINEERING INFRASTRUCTURE AND CAPABILITIES. THIS SUPPORT WILL BE NEEDED TO PRODUCE SPECIFIC ENGINEERING AND TECHNICAL PRODUCTS TO SUPPORT GROUND SYSTEM ACQUISITION, DELIVERY, LAUNCH SUPPORT, AND SUCCESSFUL ON-ORBIT OPERATIONS TO INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING AREAS: (A) PROVIDE EXPERIENCED LAUNCH PROVEN SUPPORT OF ALL PHASE C/D MISSION DEVELOPMENT TO INCLUDE SYSTEM ACQUISITION, HARDWARE AND SOFTWARE AS WELL AS ON-ORBIT PROCEDURE DEVELOPMENT, AND ENGINEERING SUSTAINMENT PLANS. B) PROVIDE SUPPORT FOR A CORRESPONDING SYSTEM-LEVEL INTEGRATED PRODUCT THAT INCLUDES SYSTEM LEVEL TROUBLESHOOTING AND THE CORRESPONDING RESOLUTION OF GROUND SYSTEM DISCREPANCIES THROUGH A YET TO BE DERIVED GROUND SYSTEM VERIFICATION PROCESS. C) SUPPORT TO DEVISE AND IMPLEMENT A GROUND SYSTEM CONFIGURATION CONTROL PROCESS. D) SUPPORT TO PRODUCE A NEW TIMELINE FOR A SERIES OF MISSION-LEVEL REVIEWS TO INCLUDE EVENTS FROM RELEASE RMM THROUGH TO LAUNCH. FOR THESE REVIEWS, CONTRACTOR IS TO SUPPLY TECHNICAL REVIEW CONTENT WHERE APPLICABLE. PROJECT AND PROGRAM REVIEWS INCLUDE, BUT ARE NOT LIMITED, TO: ORRS, PMRS, FORR, AND LAUNCH REVIEWS USING THE SNPP MISSION AS A SUCCESS MODEL. E) SUPPORT TO PRODUCE A FULLY INTEGRATED TEST PROCESS THAT INCLUDES ALL GROUND SYSTEM REQUIREMENTS LEVELS 6 THROUGH 2, FLIGHT AND INSTRUMENT SYSTEMS ESPECIALLY THOSE RELATIVE TO THERMAL VAC AND GROUND TO SPACECRAFT PRE-SHIPMENT TESTING, AS WELL AS A TEST PROCESS THAT INCLUDES A YET EVOLVING NATIONAL AND INTERNATIONAL WEATHER SERVICE CUSTOMER BASE. F) PROVIDE MAJOR TECHNICAL INPUT AND MULTI-MISSION COORDINATION BETWEEN THE GOES GROUND PROJECT, FLIGHT PROJECT, AS WELL AS COORDINATION AND PROBLEM RESOLUTION BETWEEN COMPETING RESOURCES OF THE GOES-R, SNPP, AND JPSS MISSIONS. G) PROVIDE SIGNIFICANT DESIGN SUPPORT TO THE FORMING OF A NEW MASTER GROUND SYSTEM SCHEDULE, TO INCLUDE THE GENERATION OF A NEAR-REAL TIME SCHEDULE MONITORING PROCESS THAT WILL BE USED TO ASSESS AND CORRECT TECHNICAL AND SCHEDULE RISKS AT THE PROJECT AND PROGRAM LEVELS, THE RESULTS OF WHICH WILL RESULT IN SOLUTIONS THAT WILL BE USED TO RESOLVE AND MITIGATE RISKS. H) LEVERAGE CROSS PROGRAM SUPPORT BETWEEN GOES-R, SNPP, JPSS, OTHER NASA ENTITIES, THE DEPARTMENT OF DEFENSE (DOD) AND OTHER INTELLIGENCE COMMUNITY (IC) PROGRAMS AS NEEDED. I) ASSIST THE CHIEF GSP ENGINEER IN LAUNCH ASSET REQUIREMENT ANALYSIS. — $28.9M
- THE CONTRACTOR SHALL PROVIDE SYSTEM ENGINEERING, SPECIAL STUDIES AND ASSESSMENTS SUPPORT TO MEET NASA S MISSION, GOALS AND OBJECTIVES. THE PURPOSE OF THIS SUPPORT IS TO PROVIDE NASA MANAGEMENT WITH TIMELY, OBJECTIVE SYSTEM ENGINEERING, SPECIAL STUDIES AND ASSESSMENTS OF PROGRAMS, PROJECTS AND/OR STRATEGIC ISSUES. THE KEY TECHNICAL AREAS OF SUPPORT INCLUDE CONCEPT DESIGN, ALTERNATIVES ANALYSIS, TECHNOLOGY READINESS, RISK IDENTIFICATION AND MITIGATION, LIFE CYCLE COST, AND SCHEDULE EVALUATION. — $17.7M
- NEW TASK ORDER FOR SUPPORT OF THE SPACE LAUNCH SYSTEM (SLS) SPACECRAFT/PAYLOAD INTEGRATION AND EVOLUTION OFFICE (SPIE) — $17.6M
- SPECIALIZED ENGINEERING SUPPORT TO JOINT POLAR SATELLITE SYSTEM (JPSS) FLIGHT SEGMENT RESTRUCTURING OF THE NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS) HAS RESULTED IN NOAA AND NASA ASSUMING ACQUISITION RESPONSIBILITY FOR THE AFTERNOON ORBIT OF THE CONSTELLATION. THESE SATELLITES, RENAMED THE JOINT POLAR SATELLITE SYSTEM (JPSS) FLIGHT SEGMENT, WILL BE DEVELOPED BY NASA GODDARD SPACE FLIGHT CENTER (GSFC) FOR NOAA. IN ORDER TO ASSURE THE SUCCESS OF THE JPSS DEVELOPMENT, GSFC REQUIRES SUPPORT FROM STAFF FROM THE AEROSPACE CORPORATION WHO HAD PREVIOUSLY WORKED ON NPOESS AS WELL AS SPECIALIZED ENGINEERING SUPPORT SERVICES PARTICULARLY IN THE AREA OF OPTICAL FOCAL PLANE DEVELOPMENTS IN SUPPORT OF INSTRUMENT DEVELOPMENT/TESTING AND EVALUATION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE ELECTRICAL SYSTEMS ENGINEERING SUPPORT FOR JPSS. THIS SUPPORT SHALL INCLUDE, BUT NOT BE LIMITED TO, DEVELOPING JPSS PROGRAM AND MISSION SPECIFICATIONS, REVISING AND/OR DEVELOPING JPSS INTERFACE DOCUMENTS, CONDUCTING TRADE STUDIES IN SUPPORT OF JPSS ARCHITECTURE DEFINITION AND EVOLUTION, MANAGING MISSION- AND OBSERVATORY-LEVEL TECHNICAL BUDGETS, MONITORING SPACECRAFT CONTRACTOR IN DESIGN AND PROCUREMENT ACTIVITIES, PARTICIPATING IN SPACECRAFT PROGRESS MEETINGS; DESIGN REVIEWS; TEST READINESS REVIEWS; ANOMALY BOARDS; PARTS/MATERIAL BOARDS; ETC., AND ASSISTING IN PROBLEM RESOLUTION THE CONTRACTOR SHALL PROVIDE INSTRUMENT SYSTEMS ENGINEERING SERVICES TO JPSS. THESE SERVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, SUPPORTING NPOESS TO JPSS INSTRUMENT TRANSITION BY PREPARING TECHNICAL DOCUMENTATION FOR INSTRUMENT CONTRACTS, COORDINATING INSTRUMENT REQUIREMENTS WITH MISSION- AND OBSERVATORY-LEVEL REQUIREMENTS, EVALUATING INSTRUMENT COMPLIANCE WITH NASA TECHNICAL STANDARDS, CONDUCTING TRADE STUDIES IN SUPPORT OF INSTRUMENT ACCOMMODATION, SUPPORTING THE INSTRUMENT SYSTEMS ENGINEERING STAFF, MANAGING INSTRUMENT RISK PROCESSES, ASSISTING WITH CONFIGURATION CHANGE PROCESS FOR INSTRUMENTS, AND PARTICIPATING IN INSTRUMENT DESIGN REVIEWS; TEST READINESS REVIEWS; ETC. THE CONTRACTOR SHALL PROVIDE ENGINEERING SERVICES TO OVERSEE THE JPSS INSTRUMENT DEVELOPMENT. THESE SERVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, SUPPORTING NPOESS TO JPSS INSTRUMENT TRANSITION BY PREPARING TECHNICAL DOCUMENTATION FOR INSTRUMENT CONTRACTS, COORDINATING INSTRUMENT REQUIREMENTS WITH MISSION- AND OBSERVATORY-LEVEL REQUIREMENTS, MONITORING THE OMPS AND CRIS CONTRACTOR IN EXECUTION OF INSTRUMENT BUILD AND TEST, PARTICIPATING IN INSTRUMENT PROGRESS MEETINGS; DESIGN REVIEWS; TEST READINESS REVIEWS; ANOMALY BOARDS; PARTS/MATERIAL BOARDS; ETC., REVIEWING PLANS AND PROCEDURES, ASSISTING IN PROBLEM RESOLUTION, AND REVIEWING TEST DATA FOR SPECIFICATION COMPLIANCE. — $17.3M
- IGF::OT::IGF SCIENCE MISSION DIRECTORATE (SMD) PROGRAMMATIC ASSESSMENT AND MONITORING. THE CONTRACTOR SHALL PROVIDE INDEPENDENT PROGRAMMATIC AND TECHNICAL ASSESSMENT FUNCTIONS THAT CAN:(1) IDENTIFY AND ASSESS PROJECT RISKS WHETHER TECHNICAL, COST AND SCHEDULE RELATED AND PREDICT THE PROBABILITIES AND CONSEQUENCES OF THEIR REALIZATION; (2) PREDICT THE GROWTH OF PROJECT COSTS AND SCHEDULES OVER TIME DUE TO RISKS AND UNCERTAINTY; AND (3) COMMUNICATE RESULTS AND FINDINGS IN A CLEAR, CONCISE MANNER TO SMD PROGRAM EXECUTIVES (PES), PROGRAM ANALYSTS (PAS), THEME DIRECTORS, THE SCIENCE MISSION DIRECTORATE (SMD) ASSOCIATE ADMINISTRATOR (AA) AND STAFF MEMBERS AS NEEDED, THE CONTRACTOR SHALL ALSO: (1) CONDUCT MONTHLY MONITORING OF A DESIGNATED SUBSET OF THE MOST CHALLENGING AND COMPLEX FLIGHT PROJECTS AS THEY PROCEED THROUGH DESIGN, DEVELOPMENT, AND IMPLEMENTATION IN TERMS OF THE EVOLUTION OF THEIR PROGRAMMATIC AND TECHNICAL RISKS, COST AT COMPLETION AND DELIVERY MILESTONES; (2) CONDUCT SPECIAL STUDIES AND ASSESSMENTS OF THE PAST PERFORMANCE OF FLIGHT PROGRAMS IN ORDER TO PREDICT BETTER SMDS FUTURE PERFORMANCE; AND (3) PROVIDE TECHNICAL AND PROGRAMMATIC ASSESSMENTS OF NON-FLIGHT SMD PROGRAMS AND PROJECTS.THE CONTRACTOR SHALL SUPPORT THE MISSION ANALYSIS ENGINEERING FUNCTION FOR SMD PROJECTS TO INCLUDE EXPERIENCED PERSONNEL, ANALYSIS AND ASSESSMENT TOOLS, PROCESSES AND REPORTING FUNCTIONS. ITS EFFORTS SHALL BE STRUCTURED TO ENSURE THAT THE NEEDED DATA, FINDINGS AND INSIGHTS ARE AVAILABLE IN A TIMELY MANNER TO SUPPORT SMD REVIEWS AND DECISION MAKING. THE CONTRACTOR SHALL DESIGNATE FOR EACH ASSIGNED SMD DIVISION OR THEME A MISSION ANALYSIS ENGINEER (MAE) WHO SHALL BE RESPONSIBLE FOR COORDINATING ALL ANALYSES REQUIRED FOR THE ASSESSMENT AND MONITORING FUNCTIONS OF THE DIVISION OR THEMES PROJECTS. EACH MAE SHALL: (1) MAINTAIN THE KNOWLEDGE BASE FOR THE DIVISIONS PROJECTS, INCLUDING FULL KNOWLEDGE OF ALL ON-GOING PROGRAMMATIC AND TECHNICAL ASSESSMENTS; (2) ENSURE THAT KEY ANALYSTS AND SUBJECT MATTER EXPERTS ATTEND MAJOR MILESTONE AND SELECTED PROJECT REVIEWS; AND (3) PRESENT ANALYSES, FINDINGS AND INSIGHTS TO AUDIENCES IDENTIFIED BY SMD DECISION MAKERS. — $13.8M
- THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES FOR ADVANCED RESEARCH AND TECHNOLOGY DEVELOPMENT TO DEFINE AND PROVE THE NEW DISKSAT SYSTEM CONCEPT. — $7.8M
- NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES SUPPORT FOR COMMERCIAL CREW PROGRAM SAFETY AND MISSION ASSURANCE. — $7.6M
- NEW TASK ORDER FOR SUPPORT OF THE SPACE LAUNCH SYSTEM (SLS) SPACECRAFT/PAYLOAD INTEGRATION AND EVOLUTION OFFICE (SPIE) — $7.4M
- NASA SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES (NSEETS) TASK ORDER FOR FY23. — $3.8M
- HUMAN LANDING SYSTEM (HLS) PROGRAM OFFICE SUPPORT — $3.2M
- MSC PROJECT FORMULATION SUPPORT- ASSISTANCE TO HELP LEAD THE DAY TO DAY PROJECT MANAGEMENT (INCLUDING THE DEVELOPMENT OF PROJECT PLANS, SEMPS) OF SEVERAL PROJECTS WITHIN THE MSC OFFICE PORTFOLIO. — $2.8M
- THE AEROSPACE CORPORATION WILL PROVIDE SUPPORT TO THE SPACE LAUNCH SYSTEM (SLS) SYSTEMS ENGINEERING AND INTEGRATION OFFICE (SEIO) — $2.7M
- GEOSPACE DYNAMICS CONSTELLATION (GDC) INTERDISCIPLINARY SCIENTIST SUPPORT (GDC IDS) NASA RESEARCH ANNOUNCEMENT (NRA) SOLICITATION NNH21ZDA001N-GDCIDS, B.15, GEOSPACE DYNAMICS CONSTELLATION INTERDISCIPLINARY SCIENTISTS (GDC IDS). — $2.0M
- THE AEROSPACE CORPORATION WILL PROVIDE SUPPORT TO THE HUMAN LANDING SYSTEM (HLS) MISSION ENGINEERING PROTECTION SUPPORT. — $1.5M
- HABITAL WORLDS OBSERVATORY (HWO) — $636.4K
- NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES FOR EXPLORATION GROUND SYSTEMS MODELING AND ANALYSIS SUPPORT. — $529.9K
Frequently Asked Questions
How many contracts does THE Aerospace Corporation have with National Aeronautics and Space Administration?
THE Aerospace Corporation has 23 contracts with National Aeronautics and Space Administration worth a combined $528.0M.
What is the average contract size between THE Aerospace Corporation and National Aeronautics and Space Administration?
The average contract size is $23.0M.
What percentage of THE Aerospace Corporation's contracts with National Aeronautics and Space Administration are sole-source?
0% of the contracts are sole-source awards.