Army Awards $74.8M Superfund Dredging Contract to Jacobs Project Management Co. in New Bedford, MA
Contract Overview
Contract Amount: $74,820,245 ($74.8M)
Contractor: Jacobs Project Management CO.
Awarding Agency: Department of Defense
Start Date: 2020-01-22
End Date: 2025-12-31
Contract Duration: 2,170 days
Daily Burn Rate: $34.5K/day
Competition Type: FULL AND OPEN COMPETITION
Pricing Type: COST PLUS FIXED FEE
Sector: Construction
Official Description: NEW BEDFORD HARBOR SUPERFUND SITE DREDGING, NEW BEDFORD, MA
Place of Performance
Location: NEW BEDFORD, BRISTOL County, MASSACHUSETTS, 02740
Plain-Language Summary
Department of Defense obligated $74.8 million to JACOBS PROJECT MANAGEMENT CO. for work described as: NEW BEDFORD HARBOR SUPERFUND SITE DREDGING, NEW BEDFORD, MA Key points: 1. The contract focuses on heavy civil engineering construction for the New Bedford Harbor Superfund site. 2. Jacobs Project Management Co. secured this significant award. 3. The Department of the Army is the awarding agency. 4. The contract type is Cost Plus Fixed Fee, indicating potential for cost overruns. 5. The duration is substantial at 2170 days.
Value Assessment
Rating: fair
The Cost Plus Fixed Fee contract type can lead to higher costs than fixed-price contracts if not managed carefully. The awarded amount of $74.8M for a multi-year project requires close monitoring.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, suggesting a competitive bidding process. However, the Cost Plus Fixed Fee structure may not always yield the most price-efficient outcome.
Taxpayer Impact: Taxpayer funds are being utilized for environmental remediation, which is a necessary public service. The efficiency of the spending will depend on project management and cost control.
Public Impact
Environmental cleanup of a major Superfund site. Long-term project impacting local environment and community. Significant federal investment in infrastructure and remediation. Potential for job creation in the construction sector.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Cost Plus Fixed Fee contract type.
- Long project duration (2170 days).
- Large contract value ($74.8M).
Positive Signals
- Full and open competition.
- Addresses critical environmental remediation needs.
Sector Analysis
This contract falls under heavy and civil engineering construction, specifically environmental remediation. Spending benchmarks for Superfund site cleanups vary widely based on site complexity and remediation methods.
Small Business Impact
The data does not indicate any specific set-asides for small businesses. Further analysis would be needed to determine if small businesses were involved as subcontractors.
Oversight & Accountability
The Department of the Army is responsible for oversight. The long duration and cost-plus nature of the contract necessitate robust oversight to ensure cost efficiency and project completion.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Cost Plus Fixed Fee contract structure.
- Long project duration.
- Potential for cost overruns.
- Lack of specific cost-per-unit data.
- Environmental remediation complexity.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, ma, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $74.8 million to JACOBS PROJECT MANAGEMENT CO.. NEW BEDFORD HARBOR SUPERFUND SITE DREDGING, NEW BEDFORD, MA
Who is the contractor on this award?
The obligated recipient is JACOBS PROJECT MANAGEMENT CO..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $74.8 million.
What is the period of performance?
Start: 2020-01-22. End: 2025-12-31.
What is the projected cost per unit of material dredged or area remediated?
The provided data does not include specific metrics for cost per unit of material dredged or area remediated. A Cost Plus Fixed Fee contract makes such per-unit cost analysis challenging as the final costs are determined after the work is completed, based on actual expenses plus a fixed fee. Detailed project reports would be required to derive these figures.
What are the key performance indicators (KPIs) for this contract, and how are they being tracked?
Specific Key Performance Indicators (KPIs) are not detailed in the provided data. For a project of this nature and contract type, KPIs would likely focus on environmental cleanup targets, adherence to schedule, safety compliance, and budget management. The Department of the Army's contracting officer's representative (COR) would typically be responsible for monitoring these KPIs throughout the contract's duration.
How does the awarded amount compare to similar Superfund site remediation projects of comparable size and complexity?
Comparing this $74.8 million contract to similar Superfund site remediations requires access to a broader dataset of environmental cleanup projects. Factors like the type and volume of contaminants, geographical location, accessibility, and specific remediation technologies employed significantly influence costs. Without such comparative data, it's difficult to definitively assess if this award represents a benchmark or an outlier.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912WJ14R0003
Pricing Type: COST PLUS FIXED FEE (U)
Evaluated Preference: NONE
Contractor Details
Parent Company: Jacobs Engineering Group Inc.
Address: 1999 BRYAN ST, DALLAS, TX, 75201
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $76,899,630
Exercised Options: $74,820,245
Current Obligation: $74,820,245
Subaward Activity
Number of Subawards: 78
Total Subaward Amount: $74,731,059
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W912WJ15D0001
IDV Type: IDC
Timeline
Start Date: 2020-01-22
Current End Date: 2025-12-31
Potential End Date: 2025-12-31 00:00:00
Last Modified: 2025-04-30
More Contracts from Jacobs Project Management CO.
- SAN Juan Lateral Water Treatment Plant — $270.1M (Department of the Interior)
- Dafis UDO Reconstruct W/O Advance — $218.0M (Department of Transportation)
- Requirement to Provide Environmental Remediation Services for the NEW Bedford Superfund Site, Located in NEW Bedford Harbor — $62.5M (Department of Defense)
- Remedial Action Contract, NEW Bedford Harbor, MA — $51.4M (Department of Defense)
- THE Remediation Activities AT the NEW Bedford Harbor Superfund Site, NEW Bedford, MA — $51.1M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)