Army awards $28.8M contract for beach fill placement in South Carolina
Contract Overview
Contract Amount: $28,796,617 ($28.8M)
Contractor: Great Lakes Dredge & Dock CO, LLC
Awarding Agency: Department of Defense
Start Date: 2017-06-16
End Date: 2018-07-11
Contract Duration: 390 days
Daily Burn Rate: $73.8K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: IGF::OT::IGF BEACH FILL PLACEMENT REACH 3
Place of Performance
Location: NORTH MYRTLE BEACH, HORRY County, SOUTH CAROLINA, 29582
Plain-Language Summary
Department of Defense obligated $28.8 million to GREAT LAKES DREDGE & DOCK CO, LLC for work described as: IGF::OT::IGF BEACH FILL PLACEMENT REACH 3 Key points: 1. Contract awarded to Great Lakes Dredge & Dock Co, LLC for $28.8M. 2. Full and open competition was utilized. 3. The contract is for heavy and civil engineering construction. 4. Project location is South Carolina.
Value Assessment
Rating: fair
The awarded amount of $28.8M appears to be within a reasonable range for heavy civil engineering projects of this nature, though specific benchmarks are difficult to ascertain without detailed project scope and comparable contract data. The firm fixed price structure suggests a defined cost expectation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition is a positive indicator for price discovery, allowing multiple qualified bidders to submit proposals. This method generally leads to more competitive pricing by leveraging market forces.
Taxpayer Impact: The competitive bidding process aims to ensure taxpayer funds are used efficiently for this infrastructure project.
Public Impact
Enhances coastal resilience and protects infrastructure from erosion. Supports local tourism and economic activity dependent on beaches. Contributes to environmental restoration and habitat preservation.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen environmental conditions arise.
- Contract duration may be subject to weather delays.
- Long-term effectiveness depends on ongoing maintenance and environmental factors.
Positive Signals
- Utilizes full and open competition for best value.
- Firm fixed price contract provides cost certainty.
- Project addresses critical coastal protection needs.
Sector Analysis
This contract falls within the heavy and civil engineering construction sector, which includes large-scale infrastructure projects. Spending in this sector can vary significantly based on federal infrastructure initiatives and environmental needs.
Small Business Impact
The contract was awarded to Great Lakes Dredge & Dock Co, LLC, a large business. There is no indication of small business participation in this specific award, suggesting potential missed opportunities for subcontracting.
Oversight & Accountability
Standard contract oversight by the Department of the Army is expected. The firm fixed price nature of the contract provides a degree of financial accountability, but performance monitoring is crucial.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for environmental impact during dredging.
- Contract duration susceptible to weather delays.
- Long-term maintenance needs not fully detailed.
- Limited small business involvement.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, sc, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $28.8 million to GREAT LAKES DREDGE & DOCK CO, LLC. IGF::OT::IGF BEACH FILL PLACEMENT REACH 3
Who is the contractor on this award?
The obligated recipient is GREAT LAKES DREDGE & DOCK CO, LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $28.8 million.
What is the period of performance?
Start: 2017-06-16. End: 2018-07-11.
What is the projected long-term cost-effectiveness of this beach fill placement in mitigating erosion compared to alternative solutions?
The long-term cost-effectiveness hinges on the durability of the fill material, the rate of erosion, and the frequency of necessary replenishment. While initial placement costs are significant, it can be more cost-effective than repeated damage repair or loss of valuable coastal property. A comprehensive lifecycle cost analysis would be needed for a definitive assessment.
What are the potential environmental risks associated with the dredging and fill material, and how are they being mitigated?
Potential environmental risks include disruption of marine habitats, sediment plume impacts on water quality, and the introduction of non-native species. Mitigation strategies typically involve careful selection of fill material, controlled dredging operations, monitoring of water quality, and adherence to environmental permits and regulations to minimize ecological disturbance.
How will the effectiveness of the beach fill be measured post-completion to ensure the investment meets its intended goals?
Effectiveness is typically measured through post-completion surveys of beach width and volume, monitoring of shoreline change rates, and assessment of dune stability. Performance metrics may also include the reduction in storm damage to coastal infrastructure and the sustained ecological health of the replenished area over a defined period.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR NONBUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W912HP17B0003
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Great Lakes Dredge & Dock Corporation (UEI: 362899130)
Address: 2122 YORK RD STE 200, OAK BROOK, IL, 60523
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Limited Liability Corporation, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $28,796,617
Exercised Options: $28,796,617
Current Obligation: $28,796,617
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2017-06-16
Current End Date: 2018-07-11
Potential End Date: 2018-07-11 00:00:00
Last Modified: 2021-02-25
More Contracts from Great Lakes Dredge & Dock CO, LLC
- Post 45 Charleston Entrance Channel Maintenance and NEW Work Dredging — $304.5M (Department of Defense)
- FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (snwwcip), TX Sabine Extension Channel to Sabine Pass Outer BAR, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas — $219.1M (Department of Defense)
- Miami HBR Phase 3 Construciton — $215.8M (Department of Defense)
- Jacksonville Harbor Construction Dredging Contract B Igf::ct::igf — $193.5M (Department of Defense)
- Unrestricted Procurement for Freeport Harbor Channel Improvement Project, Dredging Reaches 1, 2 and 4, in Brazoria County, Freeport, Texas. Hopper Dredging — $172.4M (Department of Defense)
View all Great Lakes Dredge & Dock CO, LLC federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)