DoD Awards $12.2M Contract for Saylorville Control Tower Sluice Gate to BCI Construction USA, Inc
Contract Overview
Contract Amount: $12,247,448 ($12.2M)
Contractor: BCI Construction USA, Inc.
Awarding Agency: Department of Defense
Start Date: 2023-09-20
End Date: 2027-06-01
Contract Duration: 1,350 days
Daily Burn Rate: $9.1K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 5
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: SAYLORVILLE CONTROL TOWER SLUICE GATE
Place of Performance
Location: JOHNSTON, POLK County, IOWA, 50131
State: Iowa Government Spending
Plain-Language Summary
Department of Defense obligated $12.2 million to BCI CONSTRUCTION USA, INC. for work described as: SAYLORVILLE CONTROL TOWER SLUICE GATE Key points: 1. The contract value of $12.2 million is significant for a single control tower component. 2. BCI Construction USA, Inc. secured this award through full and open competition. 3. The project duration of 1350 days suggests a complex and potentially lengthy construction process. 4. The firm fixed price contract type aims to control costs, but potential for overruns exists with long durations.
Value Assessment
Rating: fair
The contract value of $12.2 million for a sluice gate appears high. Benchmarking against similar infrastructure projects for control tower components is needed to assess value.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
Full and open competition was utilized, which is positive for price discovery. However, the specific nature of the component and the duration may have limited the number of truly competitive bids.
Taxpayer Impact: Taxpayer funds are being used for critical infrastructure maintenance. The firm fixed price contract aims to provide cost certainty, but the high value warrants scrutiny of the final cost.
Public Impact
Ensures operational integrity of the Saylorville control tower, crucial for regional water management. Supports local construction jobs and economic activity within Iowa. Potential for disruption to local water levels or navigation during construction phases.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- High contract value for a specific component.
- Long project duration.
- Lack of specific performance metrics in provided data.
Positive Signals
- Full and open competition.
- Firm fixed price contract type.
Sector Analysis
This contract falls under Highway, Street, and Bridge Construction, a sector often characterized by large capital investments and long project timelines. Benchmarks for similar specialized infrastructure components are essential for value assessment.
Small Business Impact
The data indicates no specific set-aside for small businesses, and the prime contractor is not identified as a small business. Further analysis would be needed to determine if small businesses were involved as subcontractors.
Oversight & Accountability
The Department of the Army is the awarding agency, implying oversight from a federal entity. However, the long duration necessitates ongoing monitoring to ensure progress and adherence to the fixed price.
Related Government Programs
- Highway, Street, and Bridge Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for cost overruns despite fixed price due to long duration.
- Limited competition impact due to specialized nature of the component.
- Lack of detailed technical specifications in the provided data.
- Dependency on a single contractor for a critical infrastructure component.
Tags
highway-street-and-bridge-construction, department-of-defense, ia, definitive-contract, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $12.2 million to BCI CONSTRUCTION USA, INC.. SAYLORVILLE CONTROL TOWER SLUICE GATE
Who is the contractor on this award?
The obligated recipient is BCI CONSTRUCTION USA, INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $12.2 million.
What is the period of performance?
Start: 2023-09-20. End: 2027-06-01.
What is the specific function of this sluice gate within the Saylorville control tower, and how does its failure impact operations?
The sluice gate likely controls water flow or levels associated with the Saylorville control tower's function, which could be related to flood control, navigation, or power generation. Its failure could lead to compromised water management, potential flooding, or disruption of associated services, necessitating urgent and potentially costly repairs or replacements.
Are there any identified risks associated with BCI Construction USA, Inc.'s past performance on similar large-scale infrastructure projects?
Assessing BCI Construction USA, Inc.'s past performance is crucial. Reviewing their track record on comparable projects, including adherence to schedules, budget management, and quality of work, will help identify potential risks for this contract. Information on any past disputes, delays, or cost overruns would be particularly relevant.
How will the effectiveness of the new sluice gate be measured post-installation to ensure it meets operational requirements?
Effectiveness will be measured through rigorous testing and commissioning protocols after installation. This includes verifying the gate's ability to operate within specified parameters for flow control, sealing, and durability under various conditions. Performance data collected during initial operations and compared against design specifications will confirm its effectiveness.
Industry Classification
NAICS: Construction › Highway, Street, and Bridge Construction › Highway, Street, and Bridge Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: W912EK23B0007
Offers Received: 5
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 4154 LUTHER FOWLER RD, PACE, FL, 32571
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Service Disabled Veteran Owned Business, Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business, Veteran Owned Business
Financial Breakdown
Contract Ceiling: $12,247,448
Exercised Options: $12,247,448
Current Obligation: $12,247,448
Actual Outlays: $1,278,325
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Timeline
Start Date: 2023-09-20
Current End Date: 2027-06-01
Potential End Date: 2027-06-01 00:00:00
Last Modified: 2025-10-08
More Contracts from BCI Construction USA, Inc.
- Grand Coulee DAM Left and Right Powerhouses Bridge Crane Replacements — $25.5M (Department of the Interior)
- Work IS for Replacement of 5 Cranes AT Hungry Horse DAM. the North Powerhouse Bridge Crane, South Powerhouse Bridge Crane, Valve House Bridge Crane, Machine Shop Bridge Crane and Gantry Crane on the Crest of the DAM — $18.9M (Department of the Interior)
- Barkley DAM, Spillway Gates Mechanical and Electrical Rehab-Base Contract- Gates 12-7 — $16.0M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)