Dod's $39.6M FA22 Fueled Comp AC Oh/Test FAC Contract Awarded to Big-D Construction Corp
Contract Overview
Contract Amount: $39,597,786 ($39.6M)
Contractor: Big-D Construction Corp
Awarding Agency: Department of Defense
Start Date: 2007-09-13
End Date: 2010-03-23
Contract Duration: 922 days
Daily Burn Rate: $42.9K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 2
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: FA22 FUELED COMP AC OH/TEST FAC
Place of Performance
Location: HILL AFB, DAVIS County, UTAH, 84056
State: Utah Government Spending
Plain-Language Summary
Department of Defense obligated $39.6 million to BIG-D CONSTRUCTION CORP for work described as: FA22 FUELED COMP AC OH/TEST FAC Key points: 1. The contract value of $39.6M is significant for a construction project. 2. Full and open competition was utilized, suggesting a competitive bidding process. 3. The project duration of 922 days indicates a substantial undertaking. 4. The sector is Commercial and Institutional Building Construction, a common area for federal spending.
Value Assessment
Rating: fair
The contract value of $39.6M appears to be within a reasonable range for a large-scale construction project of this nature, though specific benchmarks are unavailable without more detailed project scope.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, which typically leads to better price discovery and potentially lower costs for the government. The presence of multiple bidders would have driven competitive pricing.
Taxpayer Impact: The use of full and open competition aims to ensure taxpayer funds are used efficiently by securing the best value through a competitive process.
Public Impact
This project likely involved significant construction or renovation, impacting federal facilities and potentially local infrastructure. The duration suggests a long-term commitment of resources and potential disruption during the construction period. The award to BIG-D CONSTRUCTION CORP contributes to economic activity within the construction sector.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns given the project duration.
- Scope creep could impact final cost and timeline.
- Quality control during a long construction project is crucial.
Positive Signals
- Awarded under full and open competition.
- Firm fixed price contract provides cost certainty.
- Project supports federal infrastructure needs.
Sector Analysis
This contract falls within the Commercial and Institutional Building Construction sector, which is a significant area of federal procurement. Spending in this sector can fluctuate based on infrastructure needs and modernization efforts.
Small Business Impact
The data does not indicate if small businesses were involved as subcontractors. Further analysis would be needed to determine the extent of small business participation.
Oversight & Accountability
Standard oversight mechanisms for federal construction contracts would apply, including site inspections, progress reporting, and quality assurance checks to ensure compliance with contract terms and specifications.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Long project duration (922 days) increases risk of delays and cost escalation.
- Lack of detail on project scope makes precise value assessment difficult.
- No information on small business subcontracting.
- Potential for unforeseen site conditions in construction projects.
Tags
commercial-and-institutional-building-co, department-of-defense, ut, dca, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $39.6 million to BIG-D CONSTRUCTION CORP. FA22 FUELED COMP AC OH/TEST FAC
Who is the contractor on this award?
The obligated recipient is BIG-D CONSTRUCTION CORP.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $39.6 million.
What is the period of performance?
Start: 2007-09-13. End: 2010-03-23.
What was the specific scope of work for the FA22 FUELED COMP AC OH/TEST FAC project?
The specific scope of work for the FA22 FUELED COMP AC OH/TEST FAC project is not detailed in the provided data. It likely involved the construction, renovation, or outfitting of an "OH/TEST FAC" (likely an Operations/Housing or Operations/Testing Facility) for the Department of the Army, potentially related to fueling or maintenance operations.
Were there any significant cost deviations or change orders during the contract period?
The provided data does not include information on cost deviations or change orders. A comprehensive review of contract modifications and financial reports would be necessary to assess if the final cost differed significantly from the initial award amount or if numerous change orders were issued.
How effectively did the full and open competition process ensure value for the taxpayer on this project?
The full and open competition process is designed to ensure taxpayer value by fostering a competitive environment that drives down prices. Without knowing the number of bids received or the price spread among them, it's difficult to definitively assess the effectiveness. However, the process itself is a strong indicator of an effort to achieve best value.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W9123807R0010
Offers Received: 2
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 420 EAST SOUTH TEMPLE, SUITE 550, SALT LAKE CITY, UT, 90
Business Categories: Category Business, Not Designated a Small Business
Financial Breakdown
Contract Ceiling: $39,597,786
Exercised Options: $39,597,786
Current Obligation: $39,597,786
Contract Characteristics
Cost or Pricing Data: NO
Timeline
Start Date: 2007-09-13
Current End Date: 2010-03-23
Potential End Date: 2010-03-23 00:00:00
Last Modified: 2009-10-15
More Contracts from Big-D Construction Corp
- CMC Construction Services for the Frank E. Moss Seismic Upgrade, Backfill, and Renovation Project Located in Salt Lake City, Utah — $132.7M (General Services Administration)
- CMC Services for the IRS Service Center Limited Scope Modernization Project in Ogden UT — $47.3M (General Services Administration)
- F-22 Heavy Maintenance & Backshop — $45.5M (Department of Defense)
- Design-Build Life Science Test Facility Addition, Dugway Proving Grounds, Utah — $32.1M (Department of Defense)
- SOF C-130 Maintenance Hangar AMU, Cafb — $16.1M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)