DoD Awards $20.5M Fire Protection System Contract to Brice Civil Constructors, Inc
Contract Overview
Contract Amount: $20,487,444 ($20.5M)
Contractor: Brice Civil Constructors, Inc.
Awarding Agency: Department of Defense
Start Date: 2023-03-22
End Date: 2025-04-21
Contract Duration: 761 days
Daily Burn Rate: $26.9K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Number of Offers Received: 5
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: PROVIDE FIRE PROTECTION SYSTEM CAPE LISB
Place of Performance
Location: JBER, ANCHORAGE County, ALASKA, 99505
State: Alaska Government Spending
Plain-Language Summary
Department of Defense obligated $20.5 million to BRICE CIVIL CONSTRUCTORS, INC. for work described as: PROVIDE FIRE PROTECTION SYSTEM CAPE LISB Key points: 1. Contract awarded for fire protection system upgrades. 2. Brice Civil Constructors, Inc. secured the deal. 3. Competition method was 'Full and Open Competition After Exclusion of Sources'. 4. The contract is for the Department of the Army. 5. Project duration is 761 days.
Value Assessment
Rating: good
The awarded amount of $20.5M appears reasonable for a fire protection system project of this scale and duration. Benchmarking against similar large-scale construction projects for critical infrastructure would provide further validation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The competition method 'Full and Open Competition After Exclusion of Sources' suggests a potentially limited competitive landscape. While full and open, the exclusion of specific sources may impact price discovery and overall market competition.
Taxpayer Impact: The use of taxpayer funds for this essential infrastructure upgrade is justified by the need for fire protection. The competitive process, even if limited, aims to secure a fair price.
Public Impact
Ensures critical fire safety infrastructure for military personnel and assets. Supports the construction sector and associated supply chains. Enhances operational readiness and safety at the specified Army installation. Represents a significant investment in facility maintenance and modernization.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Limited competition due to source exclusion.
- Potential for cost overruns in fixed-price contracts for complex projects.
Positive Signals
- Addresses critical safety needs.
- Awarded to a single, established contractor.
- Clear project scope and duration.
Sector Analysis
This contract falls within the construction sector, specifically related to infrastructure development and maintenance. Spending benchmarks for similar fire protection system installations on federal properties would be relevant for a deeper analysis.
Small Business Impact
The data indicates that Brice Civil Constructors, Inc. is the prime contractor and there is no indication of small business subcontracting in the provided details. Further investigation would be needed to determine if small businesses are involved in the supply chain.
Oversight & Accountability
The Department of the Army is responsible for oversight of this contract. Standard procurement regulations and contract management practices should ensure accountability and proper execution of the project.
Related Government Programs
- Water and Sewer Line and Related Structures Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Limited competition.
- Long project duration increases risk exposure.
- Potential for scope creep in construction projects.
- Dependence on a single prime contractor.
Tags
water-and-sewer-line-and-related-structu, department-of-defense, ak, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $20.5 million to BRICE CIVIL CONSTRUCTORS, INC.. PROVIDE FIRE PROTECTION SYSTEM CAPE LISB
Who is the contractor on this award?
The obligated recipient is BRICE CIVIL CONSTRUCTORS, INC..
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $20.5 million.
What is the period of performance?
Start: 2023-03-22. End: 2025-04-21.
What specific criteria led to the exclusion of certain sources in the 'Full and Open Competition After Exclusion of Sources' method, and how did this impact the final bid price?
The exclusion of sources typically occurs when specific technical capabilities, past performance, or unique requirements necessitate a narrowed field. Understanding these criteria is crucial to assess if the exclusion was justified and if it potentially limited competitive pricing. Without detailed justification, it's difficult to definitively state the price impact, though limited competition often leads to higher bids.
What are the key performance indicators (KPIs) for this fire protection system contract, and how will their achievement be measured to ensure effectiveness and taxpayer value?
Key performance indicators would likely include system functionality, compliance with fire codes, installation timelines, and defect-free completion. Measurement would involve rigorous testing, inspections by government representatives, and adherence to the contract's technical specifications and schedule. Regular progress reports and final acceptance testing are standard mechanisms to ensure effectiveness and value.
Are there any potential risks associated with the 761-day duration of this project, such as material price fluctuations or unforeseen site conditions, and what mitigation strategies are in place?
A 761-day duration presents risks like material price volatility and the possibility of encountering unforeseen site conditions (e.g., soil issues, existing utility conflicts). Mitigation strategies might include contract clauses addressing price escalation, contingency allowances for unknown conditions, and robust project management to proactively identify and address issues as they arise.
Industry Classification
NAICS: Construction › Utility System Construction › Water and Sewer Line and Related Structures Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: W911KB18R0038
Offers Received: 5
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 3700 CENTERPOINT DR SUITE 8173, ANCHORAGE, AK, 99503
Business Categories: 8(a) Program Participant, Alaskan Native Corporation Owned Firm, Category Business, Corporate Entity Not Tax Exempt, DoT Certified Disadvantaged Business Enterprise, Minority Owned Business, Native American Owned Business, Self-Certified Small Disadvantaged Business, Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $20,493,292
Exercised Options: $20,487,444
Current Obligation: $20,487,444
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W911KB19D0013
IDV Type: IDC
Timeline
Start Date: 2023-03-22
Current End Date: 2025-04-21
Potential End Date: 2025-04-21 00:00:00
Last Modified: 2025-04-01
More Contracts from Brice Civil Constructors, Inc.
- Mcchord Airfield Bridge Repair, Jblm — $91.9M (Department of Defense)
- Barrow Coastal Erosion Task Order 1 — $65.0M (Department of Defense)
- This Project IS Located NE of Columbia Falls MT and Consists of NEW Steel Girder Bridge, Removal of Existing Bridge, Embankment, Excavation, Turnout Rehabilitation, Curve Enhancement, Utility Relocations and Installation of NEW Park Utilities, Signag — $22.6M (Department of Transportation)
- THE Contractor Shall Furnish the Equipment, Materials, Supplies, and Manpower Required to Perform Maintenance Dredging — $4.0M (Department of Defense)
- Project Title/Location: FTW508 Airfield Pavement, Vault, and Shoulder Repair, Fort Wainwright, Alaska — $2.0M (Department of Defense)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)