Yosemite Roadwork Contract Awarded to Granite Construction for $18.6M
Contract Overview
Contract Amount: $18,607,205 ($18.6M)
Contractor: Granite Construction Company
Awarding Agency: Department of Transportation
Start Date: 2010-02-03
End Date: 2011-08-17
Contract Duration: 560 days
Daily Burn Rate: $33.2K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 6
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: 24.4 MILES OF ROADWORK AT YOSEMITE NP.
Place of Performance
Location: EL PORTAL, MARIPOSA County, CALIFORNIA, 95318, UNITED STATES OF AMERICA
Plain-Language Summary
Department of Transportation obligated $18.6 million to GRANITE CONSTRUCTION COMPANY for work described as: 24.4 MILES OF ROADWORK AT YOSEMITE NP. Key points: 1. Contract awarded to a single, large construction firm. 2. Project duration of 560 days for 24.4 miles of roadwork. 3. Firm Fixed Price contract type suggests cost certainty. 4. Federal Highway Administration is the contracting agency.
Value Assessment
Rating: fair
The contract value of $18.6M for 24.4 miles of roadwork appears reasonable given the scope. Benchmarking against similar federal highway projects would provide a more precise assessment.
Cost Per Unit: $762,590 per mile
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, indicating a competitive bidding process. This method generally promotes price discovery and potentially better pricing for the government.
Taxpayer Impact: Taxpayer funds are being used for essential infrastructure improvements in a national park, contributing to public access and safety.
Public Impact
Improved road conditions and safety for visitors to Yosemite National Park. Potential for traffic disruptions during construction phases. Economic activity generated through construction jobs and material procurement.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen conditions arise.
- Risk of project delays impacting park access.
- Limited information on specific environmental mitigation measures.
Positive Signals
- Awarded through full and open competition.
- Firm Fixed Price contract provides cost predictability.
- Addresses critical infrastructure needs in a high-traffic national park.
Sector Analysis
This contract falls within the Highway, Street, and Bridge Construction sector. Federal spending in this area is crucial for maintaining national infrastructure, with costs varying significantly based on project complexity, location, and materials.
Small Business Impact
The data indicates the contract was awarded to Granite Construction Company, a large firm. There is no explicit information provided regarding small business participation or subcontracting opportunities within this specific contract.
Oversight & Accountability
The Federal Highway Administration is responsible for overseeing this project. Standard oversight mechanisms for federal construction projects would apply, including site inspections and progress reporting to ensure compliance and quality.
Related Government Programs
- Highway, Street, and Bridge Construction
- Department of Transportation Contracting
- Federal Highway Administration Programs
Risk Flags
- Potential for cost escalation if unforeseen site conditions arise.
- Risk of weather-related delays impacting the project timeline.
- Environmental impact during construction requires careful management.
- Ensuring adequate traffic management to minimize visitor disruption.
Tags
highway-street-and-bridge-construction, department-of-transportation, ca, dca, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Transportation awarded $18.6 million to GRANITE CONSTRUCTION COMPANY. 24.4 MILES OF ROADWORK AT YOSEMITE NP.
Who is the contractor on this award?
The obligated recipient is GRANITE CONSTRUCTION COMPANY.
Which agency awarded this contract?
Awarding agency: Department of Transportation (Federal Highway Administration).
What is the total obligated amount?
The obligated amount is $18.6 million.
What is the period of performance?
Start: 2010-02-03. End: 2011-08-17.
What specific road segments within Yosemite National Park are covered by this contract, and what are the primary objectives beyond general roadwork?
The contract covers 24.4 miles of roadwork within Yosemite National Park. While the primary objective is general road improvement, specific segments likely target areas with the most significant deterioration or safety concerns to enhance visitor access and experience. Further details would be found in the contract's statement of work.
What are the key performance indicators (KPIs) used to measure the success of this roadwork project, and how are they monitored?
Key performance indicators likely include adherence to the project schedule, quality of construction materials and workmanship, and compliance with safety and environmental regulations. Monitoring would involve regular site inspections by agency representatives, progress reports from the contractor, and potentially third-party quality assurance reviews.
How does the per-mile cost of this project compare to similar federal highway construction projects in comparable geographic regions or terrain types?
The per-mile cost of approximately $762,590 is a significant figure. A detailed comparison would require analyzing projects with similar geological conditions, environmental considerations, and labor costs. National park roadwork can sometimes be more expensive due to logistical challenges and environmental protections.
Industry Classification
NAICS: Construction › Highway, Street, and Bridge Construction › Highway, Street, and Bridge Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCT NONBUILDING FACILITIES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SEALED BID
Solicitation ID: DTFH68-10-B-00011
Offers Received: 6
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Granite Construction Incorporated (UEI: 622826360)
Address: 585 W BEACH ST, WATSONVILLE, CA, 95076
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $18,607,205
Exercised Options: $18,607,205
Current Obligation: $18,607,205
Timeline
Start Date: 2010-02-03
Current End Date: 2011-08-17
Potential End Date: 2011-08-17 00:00:00
Last Modified: 2016-11-10
More Contracts from Granite Construction Company
- Border Wall Construction- Vertical Barrier, Laredo Texas Sector, LRT-4 — $512.3M (Department of Homeland Security)
- Construction of Control Structure for SIX Submerged Tainter Gates — $252.1M (Department of Defense)
- THE Project Consists of TWO Phases: 1) Pre-Construction Services Contained in the Base Contract; and 2) Construction Services Contained in TWO Options. the Project Will Consist of Spanning the Active Pretty Rocks Landslide With an Approximately 475-F — $214.9M (Department of Transportation)
- THE Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into the Yolo Bypass System. Project Consists of Construction of a Passive Weir, Levee Setback, Fish Passage Control Among Others — $178.6M (Department of Defense)
- Border Infrastructure-Barrier Gaps Design Build Construction — $178.5M (Department of Homeland Security)
Other Department of Transportation Contracts
- Dafis UDO Reconstruct W/O Advance — $3.8B (Lockheed Martin Services, LLC)
- THE Purpose of This Delivery Order Award IS to ADD Funding for FTI Telecommunications Services — $1.9B (Harris Corporation)
- Provide Funding for Clin 302 for Pre-Flight and In-Flight Services. Contract Number Dtfawa-05-C-00031, Lockheed Martin. POP 01/16/08-03/31/08 — $1.9B (Leidos, Inc.)
- Center for Advanced Aviation Development (caasd) Ffrdc Mitre — $1.7B (THE Mitre Corporation)
- Dafis UDO Reconstruct W/O Advance — $1.5B (Harris Corporation)