DHS Coast Guard Awards $39.8M Task Order to Birdon America Inc. for Ship Design & Engineering
Contract Overview
Contract Amount: $39,861,094 ($39.9M)
Contractor: Birdon America Inc
Awarding Agency: Department of Homeland Security
Start Date: 2023-03-02
End Date: 2025-03-01
Contract Duration: 730 days
Daily Burn Rate: $54.6K/day
Competition Type: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Pricing Type: FIRM FIXED PRICE
Sector: Other
Official Description: TASK ORDER CLIN 0001 DESIGN AND ENGINEERING
Place of Performance
Location: DENVER, DENVER County, COLORADO, 80239
State: Colorado Government Spending
Plain-Language Summary
Department of Homeland Security obligated $39.9 million to BIRDON AMERICA INC for work described as: TASK ORDER CLIN 0001 DESIGN AND ENGINEERING Key points: 1. Significant contract value for specialized ship design and engineering services. 2. Competition method indicates a potentially limited but structured procurement process. 3. Risk associated with long-term contract duration and fixed-price structure. 4. Spending falls within the broader shipbuilding and repairing sector.
Value Assessment
Rating: good
The contract value of $39.8M for a 730-day duration appears reasonable for specialized design and engineering services. Benchmarking against similar complex maritime engineering contracts would provide further validation.
Cost Per Unit: N/A
Competition Analysis
Competition Level: limited
The contract was awarded under 'FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES,' suggesting a specific justification for limiting the initial pool. This method can impact price discovery if not managed carefully.
Taxpayer Impact: Taxpayer funds are being utilized for critical infrastructure support, with the final price influenced by the competitive process employed.
Public Impact
Ensures continued operational readiness for the U.S. Coast Guard fleet. Supports specialized engineering jobs within the maritime industry. Contributes to the modernization and maintenance of national security assets.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for cost overruns if unforeseen technical challenges arise with fixed-price contract.
- Reliance on a single contractor for critical design elements.
- Limited transparency in the initial source exclusion phase.
Positive Signals
- Clear task order for essential Coast Guard operations.
- Defined contract duration and delivery schedule.
- Fixed-price contract provides budget certainty.
Sector Analysis
This contract falls under the Ship Building and Repairing sector (NAICS 336611), which is crucial for national defense and maritime security. Spending benchmarks for similar design and engineering task orders can vary widely based on complexity and vessel type.
Small Business Impact
The contract was awarded to Birdon America Inc., a specific company. Analysis is needed to determine if small businesses were subcontracted or if opportunities were missed in the primary award.
Oversight & Accountability
Oversight will be crucial to ensure Birdon America Inc. meets design specifications and delivery timelines within the fixed-price constraint. The Coast Guard's program management will be key to accountability.
Related Government Programs
- Ship Building and Repairing
- Department of Homeland Security Contracting
- U.S. Coast Guard Programs
Risk Flags
- Limited competition justification requires scrutiny.
- Fixed-price risk for complex engineering projects.
- Long contract duration increases exposure to changing requirements.
- Lack of small business participation noted.
Tags
ship-building-and-repairing, department-of-homeland-security, co, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Homeland Security awarded $39.9 million to BIRDON AMERICA INC. TASK ORDER CLIN 0001 DESIGN AND ENGINEERING
Who is the contractor on this award?
The obligated recipient is BIRDON AMERICA INC.
Which agency awarded this contract?
Awarding agency: Department of Homeland Security (U.S. Coast Guard).
What is the total obligated amount?
The obligated amount is $39.9 million.
What is the period of performance?
Start: 2023-03-02. End: 2025-03-01.
What was the specific justification for excluding sources in the initial competition phase, and how did this impact the final price?
The justification for excluding sources is critical to understanding the procurement's fairness and potential cost implications. If the exclusion was based on unique capabilities or prior performance, it might justify a higher price. However, if it limited competition unnecessarily, taxpayers may have overpaid. Further documentation is needed to assess the rationale and its effect on price discovery.
What are the key technical risks associated with this ship design and engineering task order, and how are they being mitigated under the fixed-price contract?
Technical risks could include unforeseen design complexities, integration challenges with existing systems, or material availability issues. Under a fixed-price contract, the contractor bears the primary financial risk for cost overruns. Mitigation strategies likely involve detailed technical specifications, robust project management, and contingency planning by Birdon America Inc. The Coast Guard's oversight will be vital in monitoring progress and addressing potential issues.
How does this $39.8M task order contribute to the U.S. Coast Guard's long-term strategic goals and operational effectiveness?
This task order directly supports the U.S. Coast Guard's mission by ensuring the design and engineering of critical assets are up-to-date and functional. Effective design and engineering are foundational for maintaining fleet readiness, enhancing operational capabilities (e.g., search and rescue, maritime security), and ensuring the longevity of expensive vessels. This investment is crucial for the Coast Guard's ability to fulfill its diverse and demanding responsibilities.
Industry Classification
NAICS: Manufacturing › Ship and Boat Building › Ship Building and Repairing
Product/Service Code: SHIPS, SMALL CRAFT, PONTOON, DOCKS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Address: 4965 KINGSTON ST, DENVER, CO, 80239
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Foreign Owned, Foreign-Owned and U.S.-Incorporated Business, Manufacturer of Goods, Self-Certified Small Disadvantaged Business, Small Business, Special Designations
Financial Breakdown
Contract Ceiling: $39,861,094
Exercised Options: $39,861,094
Current Obligation: $39,861,094
Contract Characteristics
Commercial Item: COMMERCIAL PRODUCTS/SERVICES
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: 70Z02323D93270001
IDV Type: IDC
Timeline
Start Date: 2023-03-02
Current End Date: 2025-03-01
Potential End Date: 2025-03-01 00:00:00
Last Modified: 2025-09-17
More Contracts from Birdon America Inc
- Production of Bridge Erection Boats (BEB) — $140.8M (Department of Defense)
- Purchase of Lltm for WLR and Wlic #1 — $105.7M (Department of Homeland Security)
- Award Inland Buoy Tender (WLR) 1801 — $83.7M (Department of Homeland Security)
- Wlic #2 — $73.9M (Department of Homeland Security)
- This Contract IS for the Purchase of the Bridge Erection Boat (BEB) to Include Both Hardware and Services. This Delivery Order IS in the Third Ordering Year to Procure Bebs and Crew Protection Kits (cpks) — $66.0M (Department of Defense)
Other Department of Homeland Security Contracts
- THE United States Coast Guard HAS a Requirement to Procure UP to Twenty-Six (26) Fast Response Cutters (frcs) on a Firm Fixed Price (FFP) Basis With an Economic Price Adjustment (EPA). Phase II of the FRC Program Will Complete the Fleet for a Total of 58 Cutters — $2.1B (Bollinger Shipyards Lockport, L.L.C.)
- Design and Construct NEW Vertical Barrier and Power Distribution, Lighting, Cameras, Equipment Shelters and Linear Ground Detection System (lgds) in Hildago County, NM — $1.8B (Fisher Sand & Gravel CO)
- Production&delivery of National Security Cutter (NSC) 6 — $1.7B (Huntington Ingalls Incorporated)
- YUM-2 Vertical Border and Waterborne Barrier Construction — $1.7B (Fisher Sand & Gravel CO)
- Construct Vertical Border Barrier — $1.6B (Fisher Sand & Gravel CO)