DoD Awards $43.5M for Fort Bragg Aerial Gunnery Range Construction to Caddell Construction
Contract Overview
Contract Amount: $43,510,219 ($43.5M)
Contractor: Caddell Construction CO. (DE), LLC
Awarding Agency: Department of Defense
Start Date: 2015-07-31
End Date: 2018-08-13
Contract Duration: 1,109 days
Daily Burn Rate: $39.2K/day
Competition Type: FULL AND OPEN COMPETITION
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: IGF::OT::IGF - AERIAL GUNNERY RANGE (AGR), FT. BRAGG, NC (BASE&OPTIONS 1-4 CLINS 0001-0022)
Place of Performance
Location: RAEFORD, HOKE County, NORTH CAROLINA, 28376
Plain-Language Summary
Department of Defense obligated $43.5 million to CADDELL CONSTRUCTION CO. (DE), LLC for work described as: IGF::OT::IGF - AERIAL GUNNERY RANGE (AGR), FT. BRAGG, NC (BASE&OPTIONS 1-4 CLINS 0001-0022) Key points: 1. Construction project awarded via full and open competition. 2. Contract type is Firm Fixed Price, indicating price certainty. 3. Project duration is 1109 days, spanning over three years. 4. Caddell Construction, a large business, is the prime contractor. 5. No small business set-aside was utilized for this contract.
Value Assessment
Rating: fair
The award amount of $43.5M for a large construction project is within a typical range for similar government contracts. However, without specific details on the scope and complexity of the aerial gunnery range, a precise pricing assessment is difficult.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded under full and open competition, suggesting a robust price discovery process. This method typically leads to competitive pricing as multiple qualified contractors can bid.
Taxpayer Impact: The use of full and open competition aims to ensure taxpayer funds are used efficiently by securing the best value through a competitive bidding process.
Public Impact
Enhances military training capabilities at Fort Bragg. Supports the operational readiness of armed forces. Potential for local economic impact through construction jobs and materials. Construction projects can sometimes lead to environmental considerations.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Long project duration could lead to cost overruns or scope creep.
- Reliance on a single large business contractor.
Positive Signals
- Awarded through full and open competition.
- Firm Fixed Price contract type provides cost certainty.
- Supports critical military training infrastructure.
Sector Analysis
This contract falls under the Commercial and Institutional Building Construction sector. Spending in this sector for the Department of Defense is substantial, supporting infrastructure development for various military operations and training facilities.
Small Business Impact
This contract was not set aside for small businesses, and the prime contractor, Caddell Construction Co. (DE), LLC, is a large business. There is no indication of small business subcontracting participation in the provided data.
Oversight & Accountability
The contract was awarded as a delivery order, suggesting it may be part of a larger indefinite-delivery/indefinite-quantity (IDIQ) contract. Oversight would focus on project execution, adherence to specifications, and budget management.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Long project duration increases risk of delays.
- Potential for cost escalation if scope changes.
- No small business participation noted.
- Reliance on a single large prime contractor.
Tags
commercial-and-institutional-building-co, department-of-defense, nc, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $43.5 million to CADDELL CONSTRUCTION CO. (DE), LLC. IGF::OT::IGF - AERIAL GUNNERY RANGE (AGR), FT. BRAGG, NC (BASE&OPTIONS 1-4 CLINS 0001-0022)
Who is the contractor on this award?
The obligated recipient is CADDELL CONSTRUCTION CO. (DE), LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $43.5 million.
What is the period of performance?
Start: 2015-07-31. End: 2018-08-13.
What specific performance metrics or quality standards are in place to ensure the aerial gunnery range meets operational requirements?
The contract likely includes detailed performance specifications and quality assurance clauses. These would outline the required standards for construction materials, safety protocols, and functional testing of the range's capabilities. Oversight by the Department of the Army would verify compliance with these standards throughout the project lifecycle.
Are there any identified risks associated with the long duration of this construction project, such as potential delays or cost increases?
A 1109-day duration presents inherent risks of schedule slippage due to weather, unforeseen site conditions, or supply chain disruptions. The firm fixed price contract offers some protection against cost increases, but significant delays could still impact overall project value and readiness timelines.
How does the construction of this aerial gunnery range contribute to the overall effectiveness and readiness of forces at Fort Bragg?
A modern, well-equipped aerial gunnery range is crucial for realistic combat training, allowing pilots and ground crews to practice live-fire exercises. This directly enhances the combat effectiveness and operational readiness of units stationed at Fort Bragg, ensuring they are prepared for diverse mission requirements.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: NEGOTIATED PROPOSAL/QUOTE
Solicitation ID: W912HN09R0088
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Caddell Construction CO., Inc. (UEI: 102087285)
Address: 2700 LAGOON PARK DR, MONTGOMERY, AL, 36109
Business Categories: Category Business, Limited Liability Corporation, Not Designated a Small Business, Partnership or Limited Liability Partnership, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $43,510,219
Exercised Options: $43,510,219
Current Obligation: $43,510,219
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W912HN10D0044
IDV Type: IDC
Timeline
Start Date: 2015-07-31
Current End Date: 2018-08-13
Potential End Date: 2018-08-13 00:00:00
Last Modified: 2018-12-17
More Contracts from Caddell Construction CO. (DE), LLC
- ---------- Comments: Please Resubmit Once Revised Action Memo and Rfca ARE Fully Cleared. COR: Daniel Replogle Contracting Officer: Alla Weinstein Approved Action Memo and Rfca ARE Attached. Rfca Link: Https://Usdos.sharepoint.com/:f:/S/Pdcrfca — $676.8M (Department of State)
- Design and Construction of the NEW Embassy Compound Located in Juba, South Sudan — $614.7M (Department of State)
- Construction Services for NEW Embassy Compound (NEC) in Mexico City, Mexicoigf::ot::igf Obligation Amount Includes Value Added TAX (VAT) — $584.2M (Department of State)
- THE Purpose of This Award IS to Provide Construction Services for a NEW Embassy Compound in Brasilia Brazil — $376.3M (Department of State)
- Design/Build NEW Embassy Compound in Port of Spain, Trinidad and Tobago — $350.2M (Department of State)
View all Caddell Construction CO. (DE), LLC federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)