DoD Awards $38.7M for Norfolk Naval Base Construction, Full Competition Used
Contract Overview
Contract Amount: $38,670,162 ($38.7M)
Contractor: Archer Western Contractors, LLC
Awarding Agency: Department of Defense
Start Date: 2011-09-26
End Date: 2015-10-04
Contract Duration: 1,469 days
Daily Burn Rate: $26.3K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: DESIGN AND CONSTRUCTION TO RELOCATE PERSONNEL TO VACATED BUILDINGS AND SPACES OF THE DISESTABLISHED JOINT FORCES COMMAND AT NAVAL STATION NORFOLK AND NAVAL SUPPORT ACTIVITY
Place of Performance
Location: NORFOLK, NORFOLK CITY County, VIRGINIA, 23511
State: Virginia Government Spending
Plain-Language Summary
Department of Defense obligated $38.7 million to ARCHER WESTERN CONTRACTORS, LLC for work described as: DESIGN AND CONSTRUCTION TO RELOCATE PERSONNEL TO VACATED BUILDINGS AND SPACES OF THE DISESTABLISHED JOINT FORCES COMMAND AT NAVAL STATION NORFOLK AND NAVAL SUPPORT ACTIVITY Key points: 1. Significant contract awarded for facility relocation and renovation. 2. Full and open competition was utilized, suggesting a competitive bidding process. 3. The project duration is substantial, indicating a complex undertaking. 4. The contract type is Firm Fixed Price, which transfers risk to the contractor.
Value Assessment
Rating: fair
The award amount of $38.7 million for construction services appears within a reasonable range for a project of this scope and duration. Benchmarking against similar large-scale military construction projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The use of full and open competition is a positive indicator for price discovery. This method allows all responsible sources to submit bids, fostering a competitive environment that should drive down costs.
Taxpayer Impact: The competitive nature of the award is expected to yield a fair price for taxpayers, minimizing potential overspending associated with less competitive procurement methods.
Public Impact
Relocation of personnel and renovation of facilities at major naval installations. Supports the operational readiness and efficiency of the Joint Forces Command. Potential for job creation within the construction sector in Virginia.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Long project duration (1469 days) could lead to cost overruns or delays.
- Firm Fixed Price contract may not account for unforeseen site conditions or material price fluctuations.
Positive Signals
- Full and open competition promotes competitive pricing.
- Project supports critical military infrastructure.
Sector Analysis
This contract falls under Commercial and Institutional Building Construction, a sector vital for infrastructure development. Spending benchmarks for similar military construction projects are typically high due to scale and security requirements.
Small Business Impact
While the primary contractor is Archer Western Contractors, LLC, the contract does not explicitly state any small business subcontracting goals. Further investigation into subcontracting opportunities would be beneficial.
Oversight & Accountability
The Department of the Navy, under the Department of Defense, is responsible for oversight. The use of a Firm Fixed Price contract and full and open competition suggests established oversight mechanisms are in place.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Long project duration
- Firm Fixed Price contract risk
- Potential for unforeseen site conditions
- Lack of explicit small business subcontracting information
Tags
commercial-and-institutional-building-co, department-of-defense, va, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $38.7 million to ARCHER WESTERN CONTRACTORS, LLC. DESIGN AND CONSTRUCTION TO RELOCATE PERSONNEL TO VACATED BUILDINGS AND SPACES OF THE DISESTABLISHED JOINT FORCES COMMAND AT NAVAL STATION NORFOLK AND NAVAL SUPPORT ACTIVITY
Who is the contractor on this award?
The obligated recipient is ARCHER WESTERN CONTRACTORS, LLC.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $38.7 million.
What is the period of performance?
Start: 2011-09-26. End: 2015-10-04.
What specific factors contributed to the long duration of this construction project?
The extended duration of 1469 days likely stems from the complexity of relocating personnel and renovating existing structures within active naval bases. Factors such as phased construction, coordination with ongoing base operations, potential environmental reviews, and the scope of the vacated spaces all contribute to the project timeline. Detailed project plans and phased execution strategies are common for such large-scale military infrastructure projects.
How does the Firm Fixed Price contract mitigate risks for the government in this construction project?
A Firm Fixed Price (FFP) contract shifts the majority of cost risk to the contractor. This means Archer Western Contractors, LLC is responsible for completing the project within the agreed-upon price, regardless of unforeseen cost increases in labor or materials. While this protects the government from budget overruns, it necessitates careful initial pricing and contractor diligence to ensure profitability and project success.
What is the anticipated impact of this construction on the operational efficiency of the Joint Forces Command?
The relocation and renovation of personnel to vacated buildings are intended to consolidate operations and improve the efficiency of the Joint Forces Command. By providing updated and potentially better-suited spaces, the project aims to enhance collaboration, streamline workflows, and modernize the command's infrastructure, ultimately supporting its mission effectiveness and readiness.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: MAINT, REPAIR, ALTER REAL PROPERTY › MAINT, ALTER, REPAIR BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: N4008507R0438
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Walsh Group Ltd., the (UEI: 121476675)
Address: 3715 NORTHSIDE PKWY BG 100 STE 550, ATLANTA, GA, 30327
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business
Financial Breakdown
Contract Ceiling: $38,670,162
Exercised Options: $38,670,162
Current Obligation: $38,670,162
Subaward Activity
Number of Subawards: 572
Total Subaward Amount: $846,589,377
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: N4008508D9739
IDV Type: IDC
Timeline
Start Date: 2011-09-26
Current End Date: 2015-10-04
Potential End Date: 2015-10-04 00:00:00
Last Modified: 2021-08-05
More Contracts from Archer Western Contractors, LLC
- Design/Build TWO Phase Construction of VON Braun Complex, Phase III, Redstone Arsenal, AL — $222.0M (Department of Defense)
- Lake Pontchartrain and Vicinity 109.02A, Levee Enlargememt for South Point to CSX Railroad and US 11 ND US 90 — $144.1M (Department of Defense)
- Residuals Treatment Facility — $97.1M (Department of Defense)
- Base - Construct Fifteen (15) Barracks — $95.3M (Department of Defense)
- Construction of a NEW Airport Traffic Control Tower (atct) and Terminal Radar Approach Control (tracon) AT Mccarran International Airport (LAS) in LAS Vegas, Nevada TAS::69 8107::TAS — $92.0M (Department of Transportation)
View all Archer Western Contractors, LLC federal contracts →
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)