DoD Awards $25.8M for Infantry Squad Defense Range Construction to Granite Construction
Contract Overview
Contract Amount: $25,789,884 ($25.8M)
Contractor: Granite Construction Company
Awarding Agency: Department of Defense
Start Date: 2016-06-30
End Date: 2019-12-17
Contract Duration: 1,265 days
Daily Burn Rate: $20.4K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: IGF::OT::IGF P637 INFANTRY SQUAD DEFENSE RANGE, MCBCP
Place of Performance
Location: CAMP PENDLETON, SAN DIEGO County, CALIFORNIA, 92055
Plain-Language Summary
Department of Defense obligated $25.8 million to GRANITE CONSTRUCTION COMPANY for work described as: IGF::OT::IGF P637 INFANTRY SQUAD DEFENSE RANGE, MCBCP Key points: 1. Construction project for a defense range valued at $25.8 million. 2. Awarded to Granite Construction Company under full and open competition. 3. Potential risks include construction delays and cost overruns in a large-scale project. 4. Spending falls within the construction sector, with specific benchmarks for civil engineering projects.
Value Assessment
Rating: good
The contract value of $25.8 million appears reasonable for a large-scale civil engineering construction project of this nature. Benchmarking against similar defense infrastructure projects would provide a more precise assessment.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded through full and open competition, indicating a robust process for price discovery and selection of the most advantageous offer. This method generally leads to competitive pricing.
Taxpayer Impact: The use of full and open competition suggests that taxpayers are likely receiving fair value for the funds expended on this construction project.
Public Impact
Enhances military training capabilities with a new infantry squad defense range. Supports local economy through construction jobs and material procurement in California. Long-term asset for the Department of the Navy's operational readiness.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Potential for scope creep impacting final cost.
- Environmental impact considerations during construction.
- Long-term maintenance and operational costs not detailed.
Positive Signals
- Awarded via full and open competition.
- Firm fixed price contract mitigates cost escalation risk.
- Experienced contractor with a history of large projects.
Sector Analysis
This project falls under heavy and civil engineering construction, a sector often characterized by large contract values and significant lead times. Benchmarks for similar defense infrastructure projects would be relevant for a detailed cost analysis.
Small Business Impact
While the prime contractor is Granite Construction Company, a large entity, the contract details do not specify any subcontracting goals or participation by small businesses. Further investigation into subcontracting plans would be beneficial.
Oversight & Accountability
The Department of the Navy's acquisition process, including the use of full and open competition and a firm fixed price contract, suggests a degree of oversight. However, ongoing monitoring of project execution and adherence to specifications is crucial.
Related Government Programs
- Other Heavy and Civil Engineering Construction
- Department of Defense Contracting
- Department of the Navy Programs
Risk Flags
- Potential for construction delays impacting operational readiness.
- Environmental impact during the construction phase.
- Uncertainty regarding long-term maintenance and operational costs.
- Lack of specified small business subcontracting goals.
Tags
other-heavy-and-civil-engineering-constr, department-of-defense, ca, delivery-order, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $25.8 million to GRANITE CONSTRUCTION COMPANY. IGF::OT::IGF P637 INFANTRY SQUAD DEFENSE RANGE, MCBCP
Who is the contractor on this award?
The obligated recipient is GRANITE CONSTRUCTION COMPANY.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Navy).
What is the total obligated amount?
The obligated amount is $25.8 million.
What is the period of performance?
Start: 2016-06-30. End: 2019-12-17.
What is the projected long-term maintenance cost for this defense range, and how does it compare to similar facilities?
The provided data does not include information on long-term maintenance costs. A comprehensive analysis would require access to the contract's operational and maintenance clauses, as well as comparative data from other defense ranges. Understanding these costs is vital for assessing the total lifecycle expense and ensuring sustained operational readiness without undue financial burden.
Are there any specific environmental mitigation plans in place for the construction of this defense range, and what are the associated costs?
Environmental mitigation plans are not detailed in the provided data. Typically, large construction projects, especially those for defense, require adherence to environmental regulations. Further review of the contract documents and associated environmental impact assessments would be necessary to identify specific mitigation strategies and their budgetary implications.
How does the cost per square foot or per acre of this defense range construction compare to similar projects in the region or nationally?
Without specific details on the size or scope of the defense range (e.g., acreage, number of firing points, specialized facilities), a precise per-unit cost benchmark is difficult to establish. However, the total award of $25.8 million for a significant construction project suggests a substantial investment. Benchmarking would require detailed project specifications and comparable cost data.
Industry Classification
NAICS: Construction › Other Heavy and Civil Engineering Construction › Other Heavy and Civil Engineering Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCTION OF BUILDINGS
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: N6247313R3011
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Granite Construction Incorporated (UEI: 622826360)
Address: 585 W BEACH ST, WATSONVILLE, CA, 95076
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $25,789,884
Exercised Options: $25,789,884
Current Obligation: $25,789,884
Contract Characteristics
Commercial Item: COMMERCIAL ITEM PROCEDURES NOT USED
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: N6247314D0066
IDV Type: IDC
Timeline
Start Date: 2016-06-30
Current End Date: 2019-12-17
Potential End Date: 2019-12-17 00:00:00
Last Modified: 2021-12-06
More Contracts from Granite Construction Company
- Border Wall Construction- Vertical Barrier, Laredo Texas Sector, LRT-4 — $512.3M (Department of Homeland Security)
- Construction of Control Structure for SIX Submerged Tainter Gates — $252.1M (Department of Defense)
- THE Project Consists of TWO Phases: 1) Pre-Construction Services Contained in the Base Contract; and 2) Construction Services Contained in TWO Options. the Project Will Consist of Spanning the Active Pretty Rocks Landslide With an Approximately 475-F — $214.9M (Department of Transportation)
- THE Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into the Yolo Bypass System. Project Consists of Construction of a Passive Weir, Levee Setback, Fish Passage Control Among Others — $178.6M (Department of Defense)
- Border Infrastructure-Barrier Gaps Design Build Construction — $178.5M (Department of Homeland Security)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)