Fort Stewart Barracks Project Awarded to Walsh Construction for $19.9 Million
Contract Overview
Contract Amount: $19,941,670 ($19.9M)
Contractor: Walsh Construction Company
Awarding Agency: Department of Defense
Start Date: 2010-08-31
End Date: 2012-05-04
Contract Duration: 612 days
Daily Burn Rate: $32.6K/day
Competition Type: FULL AND OPEN COMPETITION
Number of Offers Received: 3
Pricing Type: FIRM FIXED PRICE
Sector: Construction
Official Description: 4TH BCT (HEAVY) COMPLEX, FORT STEWART, GA
Place of Performance
Location: FORT STEWART, LIBERTY County, GEORGIA, 31315
State: Georgia Government Spending
Plain-Language Summary
Department of Defense obligated $19.9 million to WALSH CONSTRUCTION COMPANY for work described as: 4TH BCT (HEAVY) COMPLEX, FORT STEWART, GA Key points: 1. The contract was awarded under full and open competition, suggesting a competitive bidding process. 2. Walsh Construction Company secured this significant contract for building construction. 3. The project duration was 612 days, indicating a substantial construction timeline. 4. The award amount of $19.9 million represents a considerable investment in military infrastructure.
Value Assessment
Rating: fair
The contract value of $19.9 million for a barracks complex appears within a reasonable range for large-scale construction projects of this nature. Benchmarking against similar military construction contracts would provide a more precise assessment of value.
Cost Per Unit: N/A
Competition Analysis
Competition Level: full-and-open
The contract was awarded through full and open competition, which typically fosters competitive pricing and allows for a broad range of contractors to bid. This method is expected to yield a fair market price.
Taxpayer Impact: Taxpayer funds were utilized for this project, with the expectation that competitive bidding ensured a cost-effective outcome for the government.
Public Impact
Enhances military readiness and troop housing at Fort Stewart. Supports the local economy through construction jobs and related services. Represents investment in critical defense infrastructure.
Waste & Efficiency Indicators
Waste Risk Score: 50 / 10
Warning Flags
- Lack of specific cost breakdowns makes detailed value analysis difficult.
- Potential for cost overruns in large-scale construction projects.
- Limited information on sustainability or energy efficiency measures.
Positive Signals
- Awarded through full and open competition.
- Clear project scope for barracks construction.
- Experienced contractor likely involved.
Sector Analysis
This contract falls under the Commercial and Institutional Building Construction sector, specifically for military barracks. Spending in this sector is driven by defense needs and infrastructure upgrades, with costs influenced by material prices, labor, and project complexity.
Small Business Impact
The data indicates this contract was awarded to Walsh Construction Company, a large firm. There is no explicit indication of small business participation or subcontracting in the provided details.
Oversight & Accountability
Oversight would typically involve contract management by the Department of the Army to ensure adherence to specifications, timelines, and budget. Accountability rests with the contracting officer and the construction firm.
Related Government Programs
- Commercial and Institutional Building Construction
- Department of Defense Contracting
- Department of the Army Programs
Risk Flags
- Potential for construction cost overruns.
- Limited transparency on detailed cost allocation.
- No explicit mention of small business subcontracting.
- Need for detailed performance review to assess value.
Tags
commercial-and-institutional-building-co, department-of-defense, ga, do, 10m-plus
Frequently Asked Questions
What is this federal contract paying for?
Department of Defense awarded $19.9 million to WALSH CONSTRUCTION COMPANY. 4TH BCT (HEAVY) COMPLEX, FORT STEWART, GA
Who is the contractor on this award?
The obligated recipient is WALSH CONSTRUCTION COMPANY.
Which agency awarded this contract?
Awarding agency: Department of Defense (Department of the Army).
What is the total obligated amount?
The obligated amount is $19.9 million.
What is the period of performance?
Start: 2010-08-31. End: 2012-05-04.
What was the specific breakdown of costs for labor, materials, and overhead within the $19.9 million contract?
The provided data does not include a detailed cost breakdown. A comprehensive analysis would require access to the contract's financial documentation, including line items for labor, materials, equipment, overhead, and profit. This level of detail is crucial for understanding the allocation of taxpayer funds and identifying potential areas for cost savings in future projects.
Were there any significant delays or cost overruns during the 612-day construction period?
The provided data indicates the contract duration was 612 days, with specific start and end dates. However, it does not detail whether the project was completed on time or within budget. Post-award contract performance reports or agency narratives would be necessary to assess any deviations from the original schedule or cost estimates.
How does the per-square-foot construction cost compare to similar barracks projects in the region or for the Department of Defense?
Without the total square footage of the barracks and comparable project data, a precise per-square-foot cost comparison is not possible. Benchmarking against similar military construction projects, considering factors like building type, amenities, and regional construction costs, would be essential for evaluating the cost-effectiveness of this contract.
Industry Classification
NAICS: Construction › Nonresidential Building Construction › Commercial and Institutional Building Construction
Product/Service Code: CONSTRUCT OF STRUCTURES/FACILITIES › CONSTRUCT NONBUILDING FACILITIES
Competition & Pricing
Extent Competed: FULL AND OPEN COMPETITION
Solicitation Procedures: SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY
Solicitation ID: W912HN07R0100
Offers Received: 3
Pricing Type: FIRM FIXED PRICE (J)
Evaluated Preference: NONE
Contractor Details
Parent Company: Walsh Group Ltd., the (UEI: 121476675)
Address: 929 W ADAMS ST, CHICAGO, IL, 90
Business Categories: Category Business, Corporate Entity Not Tax Exempt, Not Designated a Small Business, Special Designations, Subchapter S Corporation, U.S.-Owned Business
Financial Breakdown
Contract Ceiling: $19,941,670
Exercised Options: $19,941,670
Current Obligation: $19,941,670
Subaward Activity
Number of Subawards: 36
Total Subaward Amount: $20,608,589
Contract Characteristics
Cost or Pricing Data: NO
Parent Contract
Parent Award PIID: W912HN08D0036
IDV Type: IDC
Timeline
Start Date: 2010-08-31
Current End Date: 2012-05-04
Potential End Date: 2012-05-04 00:00:00
Last Modified: 2014-02-25
More Contracts from Walsh Construction Company
- Construct Mental Health Inpatient Bldg 1 — $161.8M (Department of Defense)
- Recoveryproject#::5014::rp# Construction of the Noaa PRC AT Ford Island, Pearl Harbor, HI. the Work to BE Performed Provides for and Involves Adaptive Reuse of Historic Hangars and NEW Construction on an Historic Landmark Site. the Diverse Program Includes Marine Biology Laboratories, National Data Cneter, Dive Center, International Tsunami Information Center, Pacific Tsunami Warning Center, National Weather Service and Administrative Functions. Project Includes Site Work, Hazardous Material Abatement Work and Incidental Related Work — $158.2M (Department of Defense)
- Replace Family Housing Wafb — $137.4M (Department of Defense)
- THE NEW Outpatient Clinic Will Replace the Existing Chalmers P. Wylie VA Outpatient Clinic. the NEW OPC IS to BE a NEW 295,000 SQ. FT. Outpatient Clinic Located on 20 Acres of the Defense Supply Center in Columbus, Ohio. the NEW Clinic Will Include Services for Human Resources, Nursing Administration, Radiology, Engineering, Outpatient Pharmacy, Outpatient Surgery, Pharmacy, EEG, Pathology and Laboratory, Physical Medicine, Rehabilitation, Prosthetics and Medical Administration Services. the Project Will Also Include Surface Parking, Necessary Utilities, Site Work and Landscaping — $89.9M (Department of Veterans Affairs)
- General Construction of a NEW BED Tower Building for the VA Westside Medical Center and the Renovation of Building 1 — $86.4M (Department of Veterans Affairs)
Other Department of Defense Contracts
- Federal Contract — $51.3B (Humana Government Business Inc)
- Lrip LOT 12 Advance Acquisition Contract — $35.1B (Lockheed Martin Corporation)
- SSN 802 and 803 Long Lead Time Material — $34.7B (Electric Boat Corporation)
- 200204!008532!1700!AF600 !naval AIR Systems Command !N0001902C3002 !A!N! !N! !20011026!20120430!008016958!008016958!834951691!n!lockheed Martin Corporation !lockheed Blvd !fort Worth !tx!76108!27000!439!48!fort Worth !tarrant !texas !+000026000000!n!n!018981928201!ac15!rdte/Aircraft-Eng/Manuf Develop !a1a!airframes and Spares !2ama!jast/Jsf !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !a!n!r!2!002!n!1a!a!n!z! ! !N!C!N! ! ! !a!a!a!a!000!a!c!n! ! ! !Y! !N00019!0001! — $34.2B (Lockheed Martin Corporation)
- KC-X Modernization Program — $32.0B (THE Boeing Company)